Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC | ₹11.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.3 L+₹9,611.20 (0.86%)Rejected-AOC | ₹11.3 L+₹9,611.20 (0.86%) | L2 | Rejected-AOC L2 |
| 3 | L3₹11.3 L+₹11,420.37 (1.02%)Rejected-AOC | ₹11.3 L+₹11,420.37 (1.02%) | L3 | Rejected-AOC L3 |
Tender Value
₹11.3 L
EMD Value
₹1.1 L
Closing Date
20 Jul 2026, 3:00 pmClosed
chief engineer
chief engineer
Construction of nali and cc road from dharamveer house to kamal house for gram vijuddinpur at ward no. 09
2026_NNSAH_1169652_1
6311 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹1.1 L
12 Aug 2026
17 Jul 2026
21 Jul 2026
17 Jul 2026
20 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old dameged BOE including labour T&P etc all work complete | 90 | sqm | 16 | ₹1,440 |
| 2 | Deduction cost of old brick bat | 3.62 | cum | 800 | ₹2,898 |
| 3 | Deduction cost of old brick | 3,094.65 | No | 5.8 | ₹17,948.97 |
| 4 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a | 189 | cum | 255 | ₹48,195 |
| 5 | P.C.C 1:6:12 with in cement and fine sand and 40 mm gauge brick ballast in all work complete.(S.I. No. 273) | 21 | cum | 2,985 | ₹62,685 |
| 6 | M-150 class brick work in 1:4 cement and fine sand mortar in all complete(S.I. No. 305) | 26.22 | cum | 4,520 | ₹1,18,514.4 |
| 7 | 12mm thick plaster 1:4 cement and Fine sand mortar in all complete (SI. no. 584) | 235.2 | sqm | 160 | ₹37,632 |
| 8 | C.C 1:2:4 cement core. sand and 20 mm stone grit in all complete (S.I. No. 279 (a)) | 9.66 | cum | 5,750 | ₹55,545 |
| 9 | Construction of granular sub base by providing close graded material conforming to specification in all complete work | 47.6 | cum | 2,015 | ₹95,914 |
| 10 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete | 70.62 | cum | 7,300 | ₹5,15,526 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.42 MB
BOQ_2195376.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .