| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC PEDONG GRAM PANCHAYAT KALIMPONG 734311 | KALIMPONG | KALIMPONG | WEST BENGAL | 734311 | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹2.6 L+₹28,860.16 (12.3%)Rejected-Finance | L2 | Rejected-Finance NOT AN L1 BIDDER | |
| 3 | L3₹2.7 L+₹34,169.59 (14.6%)Rejected-Finance DUDHIA BAZAR P O JAMADUR VITA DIST DARJEELING PIN 734214 | DUDHIA | DARJEELING | WEST BENGAL | 734214 | L3 | Rejected-Finance NOT AN L1 BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejeted |
Tender Value
₹2.6 L
EMD Value
₹5,250
Closing Date
11 Aug 2025, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Pradhan Sakyong Gram Panchayat
Sakyong Gram Panchayat Office Upper Menchu, 734311
Construction of CC road from main road towards community hall at Lower Menchu under Sakyong GP
2025_GTA_887007_1
10/SGP/15FC/2024-25
Open Tender
CIVIL WORKS
Percentage
Lower Menchu, Community Hall
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,250
13 Oct 2026
4 Aug 2025
14 Aug 2025
4 Aug 2025
11 Aug 2025
4 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PWD(WB)/BUILDING WORKS/Page-1/Item-2 Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. wall(Plum) | 6.24 | m2 | 119.27 | ₹744.24 |
| 2 | PWD(WB)/BUILDING WORKS/Page-229/Item-11 Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 296 | m2 | 64 | ₹18,944 |
| 3 | PWD(WB)/BUILDING WORKS/Page-302/Item-17 Cost of stone boulder 150mm mm of N. Bengal variety | 27.2 | m3 | 1,526.4 | ₹41,518.08 |
| 4 | PWD(WB)/ROADS BRIDGES & CULVERTS/Page-264D/Item-6.02 Cement Concrete Pavement (laying with fixed form / slip form paver) Construction of un-reinforced, dowel jointed, plaincement concrete pavement over a prepared sub base with cement content as per IRC: 15-2011,coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding25 mm, mixed in a batch mix plant as per approved mix design (as per IRC:44 2008), transported to site,laid with a fixed form or slip form paver, spread,compacted and finished in a continuous operation including provision of contraction, expansion,construction and longitudinal joints, joint filler,separation membrane, sealant primer, jointpolysulphide sealant, debonding strip, dowel bar, tierod, admixtures as approved, curing compound,finishing to lines and grades as per drawing and clause 602 of Specifications for Road & Bridge Worksof MoRT&H (5th Revision). | 27.2 | m3 | 4,869.97 | ₹1,32,463.18 |
| 5 | PWD(WB)/ROADS BRIDGES & CULVERTS/Page-237/Item-3.01 Earthwork in excavation from borrow pits (landowned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments,depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting)In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting) | 6 | m3 | 119.9 | ₹719.4 |
| 6 | PWD(WB)/BUILDING WORKS/Page-27/Item-11 Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any (i) (1:3:6) proportion. | 5 | m3 | 3,964.8 | ₹19,824 |
| 7 | PWD(WB)/BUILDING WORKS/Page-42/Item-36 Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). ( c ) 9 to 12 mm. thick approved quality ply board shuttering in any concrete work. | 15.63 | m2 | 400.8 | ₹6,264.5 |
| 8 | Add 18% GST | 1 | no | 39,685.92 | ₹39,685.92 |
| 9 | Add 1% Cess | 1 | no | 2,679.68 | ₹2,679.68 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 1.16 MB
BOQ_2000483.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .