| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC VILLAGE DHANI DULAT DISTT FATEHABAD VILLAGE TIBBI DHANI DULAT DISTT FATEHABAD 125106 | FATEHABAD | FATEHABAD | HARYANA | 125106 | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.0 L+₹40,938.18 (2.62%)Rejected-Finance KHEWAT NO 1011 PLOT NO 1010 MATURAM COLONY 125050 | FATEHABAD | FATEHABAD | HARYANA | 125050 | L2 | Rejected-Finance L2 | |
| 3 | L3₹16.1 L+₹51,410.74 (3.29%)Rejected-Finance BIYANA KHERA VPO BIYANA KHERA HISSAR 125121 | HISAR | HARYANA | 125121 | L3 | Rejected-Finance L3 |
Tender Value
₹19.0 L
EMD Value
₹38,100
Closing Date
7 Apr 2026, 5:00 pmClosed
RAKESH
Municipal Council Fatehabad
construction of CC Street surya enclave gali no 1, H/o Naresh to ashok kumar T point and kalu ram master to prak dc colny in Ward No. 14, MC FatehabadFatehabad.
2026_HRY_511603_1
20262A947FAF 2858 496E 9726 A61FD5E00156272ULB
Open Tender
Civil Works
Works
150 days
Fatehabad
1st time tender
2 documents required · 2 mandatory
₹1,000
₹38,100
Yes
16 May 2026
28 Mar 2026
8 Apr 2026
28 Mar 2026
7 Apr 2026
28 Mar 2026
28 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1[10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] | |||||
| 2[17.5.2]Compacting Original Ground 2. Compacting original ground below embankment Loosening, levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction as per technical clause 305 of MORTH specifications [Through Rate] | |||||
| 3[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | |||||
| 4[2.B0241] B0241. 100 mm dia PVC pipe [Rate] | |||||
| 5[21.87.1.1]Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick lime concrete 16:24:100 (as per specified in item No.10.6) in foundations 1st class brick work laid in cement sand mortar 1:5, 40 mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12mm in thickness of 1:2 cement sand plaster and finished with floating coat of neat cement 1 mm thick left absolutely smooth polished and correct to templates including labour for fixing the C.I. road gully grating and frame including painting with coal tar (as Specified in item No. Item 21.48) complete to the requirement of the Engineer in-charge 1.1. Single road gully chamber - Size: 610mm x 457mm x 800mm [Through Rate] | |||||
| 6 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 1 | Each | - | - |
| 7 | [5.3.1.2]Dismantling Stone Pitching 1.2. Dry Conditions Stone pitching laid dry, but grouted with natural silt and clay [Through Rate] | 1 | cum | - | - |
| 8 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 1 | cum | - | - |
| 9 | [6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate] | 1 | cum | - | - |
| 10[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand). [Through Rate] | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_590402.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .