SE EUDC MEERUT
For Increasing Capacity from 8 MVA to 10 MVA and Other Associated Work at 33/11 KV Sub-Station Begum Pul in the Area of Electricity Urban Distribution Sub-Division-III, Under Electricity Urban Distribution Division-II, Meerut.
2021_PVVNL_557607_1
E-Tender No.-131/EUDC/MEERUT/2020-2021
Open Tender
Electrical Works
Lump-sum
SE EUDC MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EUDC MEERUT
₹2,000
Yes
27 Apr 2021
22 Feb 2021
23 Mar 2021
22 Feb 2021
23 Mar 2021
22 Feb 2021
Amount
Removal of HT side jumpers and LT side cable connection of existing 33/11 KV 8 MVA T/F including cutting the earthing of T/F and removal of neutral riser and all protection cable at 33/11 KV begum pul sub-station.
Dismantling of bus bar and bus bar support for making space for erection of 10 MVA transformer.
Shifting of 33/11 KV 8 MVA T/F from plinth and stacking to safe place of sub-station, complete with all accessories radiator and T/F oil.
Cartage of 3x300 sq.mm XLPE 11 KV cable (50 Mtr.) and cable jointing kits 2 No. outdoor and 2 No. indoor for above size of cable from central store to site of work including loading and unloading at both ends.
Laying of 11 KV (3x300) sq.mm XLPE cable from power transformer to 11 KV incoming switchgear in the cable trench 0-45 m wide, 0-90 m depth. providing 150 mm local trench 0-45 m wide, 0-90 m depth. providing 150 mm local sand for cushion bneath and 150 mm above the cable by laying brick vertically and brick would also be laid along the cable (minimum 18 No.) including digging of trench laying of cable in underground trenches, jointing of terminals back filling of earth and testing and commissioning of power cable etc. spare cable shall be left over and laid in the trenches in shape of 6 mm ring at both ends.
Filling of cable jointing kits with the help of LPG and connecting with the cable, complete in all respect.
Dismantling of cable support for making space for erection of 10 MVA T/F.
Dismantling of L type neutrals earthing angle iron for making space for erection of 10 MVA transformer.
Re-erection and grouting of cable support in switchyard.
Re-erection and grouting of L type neutrals earthing angle and iron for earthing and making neutral earthing properly.
Re-erection and grouting of bus bar support.
Fixing of bus bar for connecting cable complete in all respect.
Making proper cable connection with bus bar complete in all respect.
Disconnect the earthing of 8 MVA T/F and re-connect the same to newly installed 10 MVA transformer.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .