| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.2 L+₹53,412.40 (14.7%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | LAKSHMI NARAYANAN & CO L1 | SRI SIVASAKTHI ENGINEERS BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC slab etc., | 1 | m3 | 5,072 ₹5,072 | 5,070 ₹5,070 Lowest |
| 2.00 | Desilting the exsiting storm water drain | 8.5 | m3 | 112 ₹952 | 111.7 ₹949.45 Lowest |
| 3.00 | Dismantling the damged cement concrete | 7 | m3 | 573 ₹4,011 | 572.25 ₹4,005.75 Lowest |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge for Drain. | 82 | m3 | 220 ₹18,040 Lowest | 220 ₹18,040 Lowest |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 10 | m3 | 593 ₹5,930 Lowest | 5,962.42 ₹59,624.2 |
| 6.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces etc, using mild steel sheets and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 180 | m2 | 535 ₹96,300 | 534 ₹96,120 Lowest |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm hard broken granite stone jelly for all CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 30 | m3 | 6,722 ₹2,01,660 | 6,720 ₹2,01,600 Lowest |
| 8.00 | PLASTERING with cement mortar 1:5(one cement and five sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications. | 32 | m2 | 310 ₹9,920 | 309 ₹9,888 Lowest |
| 9.00 | Conveying the debris,earth ,silt etc from the site 0 to 5 km distance at the etc., compelete | 200 | m3 | 104 ₹20,800 Lowest | 104 ₹20,800 Lowest |
| 10.00Add :- GST @ 18% | |||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
8 Jan 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Reconstruction of Storm Water Drain at Poompugar Nagar in Ward No - 29, North Zone
2026_MAWS_638844_39
E7/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
23 Sept 2026
5 Jan 2026
9 Jan 2026
5 Jan 2026
8 Jan 2026
5 Jan 2026
Dismantling the damaged RCC slab etc.,
Desilting the exsiting storm water drain
Dismantling the damged cement concrete
Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge for Drain.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification.
Supplying and erecting SHUTTTERING including necessary supports for plane surfaces etc, using mild steel sheets and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed.
Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm hard broken granite stone jelly for all CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
PLASTERING with cement mortar 1:5(one cement and five sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications.
Conveying the debris,earth ,silt etc from the site 0 to 5 km distance at the etc., compelete
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
ITBE7.pdf
Additional Documents • 0.05 MB
BOQ_765540.xls
BOQ • 0.28 MB
NITE7-SWD.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .