Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹79,145
EMD Value
₹1,600
Closing Date
22 Mar 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EX ENGINEER JAL SHAKTI MECH DIV SGR
OFFICE OF THE EXECUTIVE ENGINEER JAL SHAKTI PHE MECHANICAL DIVISION SRINAGAR
Electro-Mechanical works needed for shifting-back and installation of 13.5 Cusec pumping unit with other allied works from WSS Tangnar 2nd to LIS Rajpora and installation of 11 Cusec pumping unit with other allied works at WSS Tangnar 2nd
2024_PHE_245468_1
PHE/MECH/e-NIT-97 of 02/2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Tangnar
As Per NIT
2 documents required · 2 mandatory
₹100
Yes
EX ENGINEER JAL SHAKTI MECH DIV SGR
₹1,600
Yes
27 Mar 2024
21 Feb 2024
23 Mar 2024
21 Feb 2024
22 Mar 2024
21 Feb 2024
Amount
AT WSS TANGNAR
Full load testing of 13.5 Cusec 165M head VT pumping unit at WSS Tangnar in presence of concered officers of both the PHE and I&FC Departments followed by disassembling of same by way of disconnecting the power supply to the 1000kW, 11 KV motor and then opening the cable from cable connection boxes using necessary tools and tackles. The job further includes: a) Removing/Isolating the control cabling from control cable connection box. b) Removing of terminal box modifications including buses, L-Type insulators, nuts and bolts etc. Disconnecting the LR Starter from the circuit by way of removing the input/output power cabling. c) Disconnecting the earthing strip from VT motor and opening the nuts and bolts of the motor so as to disengage it from the discharge head. d) Disengaging the motor from pump, by opening the coupling bolts, lifting the motor from the discharge head using overhead crane and place it over the motor stool at some safe place within the pump station. e) Extracting the coupling connected to pump using appropriate size puller and other tools and tackles. f) Disassembling and removing the ratchet assembly by way of opening the nuts and bolts and using special tools and tackles, opening and removing the glands from the discharge head. g) Dismantling the discharge head from the base frame by way of opening the nuts and bolts connecting the discharge head with the base frame. h) Dismantling of the column pipes and removing the line shafts and line shaft stabilizers using heavy duty chain tongs, wrench and other tools and tackles. Extracting the bowl assembly from the sump. All the tools and tackles, skilled labour required for carrying out the job shall be arranged by the firm. The extraction of work shall be carried by technically sound persons well versed with the mechanical works following all necessary SOP’s.
Disassembling of 630 Amp Tele-mechnique contactor along with bus bar arrangements and fitting of the existing 400 Amp contactor assembly. The job includes testing the contactor on full load at site. All the tools and tackles, skilled labour included in the execution of the job shall be arranged by the firm.
Loading of motor, Liquid Resistance Starter (LRS), all the parts of bowl assembly, line shaft and other parts of the pumping unit in the Plate form truck and shifting the same to LIS Rajpora and unloading thereof. All the tools and tackles, skilled labour, platform truck etc required shall be arranged by the firm. However, the work shall be carried out under close supervision vision of departmental team of engineers following all necessary SOP's.
Engagement of Hydra Crane for loading and unloading of above material at respective sites, if needed.
Installation and testing of the 11 cusec unit,140 M head VT pumping unit on above spared bay by way lowering of the bowl assembly in the sump with the help of the gantry mechanism and tools and tackles. The job further includes fitting of column pipes, transmission shafts and then fitting the entire assembly with the discharge head. The job further includes fitting back of ratchet assy., pump coupling. The job also includes fitting of 11KV, 695 KW motor on the discharge head with the help gantry mechanism. motor followed by fitting of all power and control cables etc. The job also includes testing of the motor both on no load and full load. All the tools and tackles and skilled labour involved in the execution of the job shall be arranged by the firm.
Fabrication of 8.8 mm thick, 1.25Mlong, 400 mm nominal dia., MS pipe tail piece duly welded with 400 mm dia, 40 mm thick adoptable flange (02 Nos) in order to proper connection between connect between discharge elbow and delivery line. All the tools and tackles and skilled labour, nuts, bolts involved in the execution of the job shall be arranged by the firm. Size of flanged tail Piece: 400X400X950 mm Thickness of the pipe: 8.8mm Length of the pipe:950mm No of flanges: 02 No Adoptable Flange Dia:400mm Thickness of Flange:40mm Weight of above pipe:108Kg Weight of 02 No Flanges=54X2=108 Weight of nuts, bolts with washers=14 Kg Total Wt =230 Kg
AT LIS RAJPORA
Installation of 13.5 cusec VT pumping unit shifted from WSS Tangnar by way lowering of the bowl assembly in the sump with the help of the gantry mechanism and tools and tackles, refitting of bottom line shaft with the bowl shaft by shaft coupling. The job further includes refitting of bottom column pipe with the help of HTS fasteners, fitting of bearing retainer, fitting of interline shaft with the bottom shaft along the discharge elbow. Fitting the head shaft and top column pipe and then fitting the entire assembly with the discharge head. The job further includes fitting back of ratchet assy., pump coupling with the shaft after fitting the lock nut and adjustment nut. The shifted motor shall then be installed on the discharge head with the help gantry mechanism. The job further includes installation, testing and commissioning of LR starter unit shifted back from WSS Tangnar at appropriate location/ designated spot or as per directions of Engineer In-Charge at LIS Rajpora, re-connecting of all the power / control cable connections at the respective connection boxes with proper tools and tackles, skilled & unskilled labours and finally testing the pumping quipment on no- load and full load. All the charges on a/c of tools and tackles , skilled labour, engineer involved in the execution of the job shall be borne by the firm.
M/S BHAT ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .