Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.3 L+₹26,887.68 (5.37%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.4 L+₹43,601.64 (8.71%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.5 L+₹51,595.27 (10.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹5.6 L+₹58,862.21 (11.8%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.3 L
EMD Value
₹7,350
Closing Date
23 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, PWD
O/o Buildings construction and Maintenance Division, Madurai
Special repairs to Old BMO Office rooms for providing One Stop Centre at Government Primary Health Centre at Kallandhiri in Madurai District.
2026_PWD_721973_1
05/F10 /2026-27(3),Dated 03.11.2026
Open Tender
Civil Works - Buildings
Percentage
60 days
kallandhiri
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹7,350
23 Nov 2026
6 Nov 2026
23 Nov 2026
6 Nov 2026
23 Nov 2026
6 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling, clearing away and carefully stacking materials for reuse of the following. Any thickness of : | |||||
| 1.01 | Pressed tiles & weathering course | 23.63 | Sqm | 49.2 | ₹1,162.6 |
| 1.02 | Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs | 63.35 | Sqm | 65.56 | ₹4,153.23 |
| 1.03 | Dismantling plain Cement concrete | 0.82 | Cum | 520.23 | ₹426.59 |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.Data worked out for 48 m3 per day/8 hrs. | 2.7 | Cum | 363.19 | ₹980.61 |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 0.35 | Cum | 5,708.05 | ₹1,997.82 |
| 4Brick work in following Cement Mortar 1:5 ( one cement & five M-sand) using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 4.01 | Foundation & Basement | 1.65 | Cum | 6,573.79 | ₹10,846.75 |
| 5 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 4 | Cum | 156.23 | ₹624.92 |
| 6 | Cement Concrete 1:5:10 (One cement, Five M-sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 2.15 | Cum | 5,708.05 | ₹12,272.31 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_866958.xls
BOQ • 0.35 MB
tenderdocument.pdf
Tender Documents • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .