Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹38.6 LAccepted-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | L-1 | Accepted-AOC Ok | |
| 2 | L-2₹45.4 L+₹6.8 L (17.5%)Rejected-AOC 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICAION 124103 | JHAJJAR | HARYANA | 124103 | L-2 | Rejected-AOC Ok | |
| 3 | L-3₹46.8 L+₹8.2 L (21.2%)Rejected-AOC VPO BERLA TEHSIL AND DISTT CHARKHI DADRI HARYANA | CHARKI DADRI | HARYANA | 127022 | L-3 | Rejected-AOC Ok | |
| 4 | Not Admitted-Fee/PreQual/Technical NEAR ULTRA TECH CEMENT PLANT VPO JHARLI TEHSIL MATNAHAIL DISTT JHAJJAR | JHAJJAR | HARYANA | 124021 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical JHARLI ROAD VPO JHAMRI DISTT JHAJJAR | JHAJJAR | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | OM PARKASH CONT L3 | Chahar Construction Co L2 | Suresh Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of Water Supply Scheme Jhamri Tehsil and District Jhajjar including Water Works at Jhamri Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of all civil structures (For the year 2024-25). (SDE No.2 Jhajjar Section-1). For the 1st year | 12 | Months | 1,17,986.25 ₹14,15,835 | 1,25,140 ₹15,01,680 | 1,07,333 ₹12,87,996 Lowest |
| 2.00 | Operation and Maintenance of Water Supply Scheme Jhamri Tehsil and District Jhajjar including Water Works at Jhamri Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of all civil structures (For the year 2024-25). (SDE No.2 Jhajjar Section-1). For the 2nd year | 12 | Months | 1,34,652.91 ₹16,15,834.92 | 1,26,140 ₹15,13,680 | 1,07,333 ₹12,87,996 Lowest |
| 3.00 | Operation and Maintenance of Water Supply Scheme Jhamri Tehsil and District Jhajjar including Water Works at Jhamri Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of all civil structures (For the year 2024-25). (SDE No.2 Jhajjar Section-1). For the 3rd year | 12 | Months | 1,37,569.58 ₹16,50,834.96 | 1,27,140 ₹15,25,680 | 1,07,333 ₹12,87,996 Lowest |
Tender Value
₹43.2 L
EMD Value
₹86,500
Closing Date
28 Jul 2025, 3:00 pmClosed
RAJESH KUMAR KAUSHIK
Jhajjar PHED No. 1
Operation and Maintenance of Water Supply Scheme Jhamri Tehsil and District Jhajjar including Water Works at Jhamri Tubewells, Installation pumping machinery, electric installation, street light, chlorination system and all other installation includ
2025_HRY_458564_1
20258628C860 C6CF 4D25 A930 3041147A1590590PUH
Open Tender
Civil Works
Works
1095 days
JHAMRI
3 documents required · 3 mandatory
₹2,500
Yes
₹86,500
Yes
30 Sept 2025
15 Jul 2025
28 Jul 2025
15 Jul 2025
28 Jul 2025
15 Jul 2025
Amount
Operation and Maintenance of Water Supply Scheme Jhamri Tehsil and District Jhajjar including Water Works at Jhamri Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of all civil structures (For the year 2024-25). (SDE No.2 Jhajjar Section-1). For the 1st year
Operation and Maintenance of Water Supply Scheme Jhamri Tehsil and District Jhajjar including Water Works at Jhamri Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of all civil structures (For the year 2024-25). (SDE No.2 Jhajjar Section-1). For the 2nd year
Operation and Maintenance of Water Supply Scheme Jhamri Tehsil and District Jhajjar including Water Works at Jhamri Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of all civil structures (For the year 2024-25). (SDE No.2 Jhajjar Section-1). For the 3rd year
Chahar Construction Co (BID ID -1305476)
OM PARKASH CONT (BID ID -1305659)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .