Tender Value
₹9.9 L
EMD Value
₹98,718
Closing Date
2 Sept 2026, 3:00 pmClosed
CE KNN
CE KNN MOTI JHEEL
Construction work of RCC Drain from Teja Gumti To OM Banquet Hall in Arra Ward 87 Under Zone02
2026_NNKAN_1180313_1
468/AA-2/26-27
Open Tender
Civil Works
Fixed-rate
45 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,718
27 Aug 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8-FS4003-Earth Work-E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand ) including 1.5left and 50m and dressing Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of SO m.lncluding dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil.-Rate-215 per 1 Cum. | 1 | cum | 215 | ₹215 |
| 2 | 4.3.1-FS5013-Concrete/R.C.C. Work-Foundations, footings, bases for columns Centering and shuttering including strutting, propping etc. and removal of form work for (Upto 5th Floor) :-Rate-212 per 1 Sqm. | - | sqm | 212 | - |
| 3 | PWD (SCH.) -273-FS5007-Concrete/R.C.C. Work-Providing and laying In position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 cement : 6 coarse sand (zone-Ill): 12 graded Brick aggregate 40 mm (nominal size)-Rate-4380 per 1 Cum. | 1 | cum | 4,380 | ₹4,375.62 |
| 4 | 5.1.3-FS5024-Concrete/R.C.C. Work-1:2:4 (1 cement : 2 course sand : 4 graded stone aggregate 20 mm nominal Providing and laying In position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level-Rate-7150.00 per 1 Cum. | 0 | cum | 7,150 | ₹0 |
| 5 | 5.2.2-FS5025-Concrete/R.C.C. Work-RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) including bending binding and fixing of reinfocement in position casting cutting of wall and satisfaction of the engineer in charge including cost of all material etc all complete (ch-5, sn-15, ref- 5.2.2)-Rate-8600.00 per 1 Cum. | - | cum | 8,600 | - |
| 6 | 5.2222-F5033-Concrete/R.C.C. Work-R.C.C slab work in open foundation 1:2:4 with cement, C-sand & 20mm stone grit ballast including shuttering mat. Lab T&P etc all complete. R.C.C slab work in open foundation 1:2:4 with cement, C-sand & 20mm stone grit ballast including shuttering mat. Lab T&P etc all complete.-Rate-8527 per 1 Cum. | - | cum | 8,527 | - |
| 7 | Non-Sor-F10021-MILD STEEL & IRON WORK-M.S. or iron in plain work such as hevey size as fabrication of M.S. M.S. or iron in plain work such as hevey size as fabrication of M.S.-Rate-7200.00 per 1 Qtl | 1 | qtl | 7,200 | ₹7,199.93 |
| 8 | Non-Sor-F31056-Non SOR-Supply and fixing of Sign board with pedastal including all labour work Supply and fixing of Sign board with pedastal including all labour work-Rate-3840.00 per 1 nos. | - | nos | 3,840 | - |
| 9 | 7.2222-F4019-Earth Work-Disposal of earth upto 3km including loading & unloading etc all complete. Disposal of earth upto 3km including loading & unloading etc all complete.-Rate-116.96 per 1 Cum. | 1 | cum | 116.96 | ₹116.96 |
| 10 | Add 18% G.S.T | 1 | tax | 1,50,587.23 | ₹1,50,587.23 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.46 MB
BOQ_2219481.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .