| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹34.3 LAccepted-AOC CHANDIGARH | ₹34.3 L | L-1 | Accepted-AOC Allotment |
| 2 | L-2₹35.5 L+₹1.2 L (3.42%)Rejected-Finance 1053 SECTOR 52 CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹35.5 L+₹1.2 L (3.42%) | L-2 | Rejected-Finance due to higher |
| 3 | L-3₹37.2 L+₹2.9 L (8.47%)Rejected-Finance CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹37.2 L+₹2.9 L (8.47%) | L-3 | Rejected-Finance due to higher |
Tender Value
₹39.0 L
EMD Value
₹77,969
Closing Date
3 Jul 2026, 11:00 amClosed
Executive Engineer, C.P. Division No.4, Chandigarh
Executive Engineer, C.P. Division No.4, Chandigarh
Additional Toilet in Type-10M Houses Sector-27, Chandigarh (2064, 2090, 2093, 2094, 2095, 2127, 2129, 2131, 2132, 2107, 2108, 2179, 2172, 2166, 2163, 2158, 2160, 2175, 2176, 2177, 2178, 2181, 2161, 2157, 2167, 2125, 2168, 2169, 2101, 2102, 2103, 2104
2026_CHD_93632_1
CP4/2026/2912580
Open Tender
Civil Works
Percentage
150 days
Additional Toilet in Type-10M Houses Sector-27, Ch
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹77,969
21 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil (As per DSR 2.8.1) | 18.02 | /cum | 253.27 | ₹4,563.93 |
| 2 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) (As per DSR 6.4.1) | 55.76 | /cum | 9,092.05 | ₹5,06,972.71 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (As per DSR 6.1.1) | 62.56 | /cum | 7,171.64 | ₹4,48,657.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (As per DSR 4.1.10) | 11.56 | /cum | 6,342.6 | ₹73,320.46 |
| 5 | Providing and fixing 35mm thick phenol bounded factory manufactured solid flush door shutter ISI marked with both side commercial face in the existing chowkhat. The rate includes the cost of iron hinges, all necessary Aluminium fittings and painting two coats over one coat of primer after preparation of surface (special quality) complete in all respect to the entire satisfaction of Engineer-in-charge. (N.S.) | 39.8 | /sqm | 3,636.6 | ₹1,44,736.68 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (As per DSR 5.9.3) | 174.08 | /sqm | 902.21 | ₹1,57,056.72 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (As per DSR 5.3) | 22.44 | /cum | 11,194.85 | ₹2,51,212.43 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more (As per DSR 5.22A.6) | 2,468.4 | /kg | 104.94 | ₹2,59,033.9 |
| 9 | 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) (As per DSR 13.16.1) | 151.98 | /sqm | 292.34 | ₹44,429.83 |
| 10 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): Flush / Ruled/ Struck or weathered pointing (As per DSR 13.31.1) | 403.92 | /sqm | 250.4 | ₹1,01,141.57 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_114693.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .