| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 CrAccepted-AOC | ₹5.6 Cr | L1 | Accepted-AOC being lowest bidder and approved by CE BLY letter no 7311 date 30.12.19 |
| 2 | L2₹6.4 Cr+₹83.9 L (15.1%)Rejected-Finance | ₹6.4 Cr+₹83.9 L (15.1%) | L2 | Rejected-Finance being higher item rates |
| 3 | Rejected-Technical FLAT NO 5 IIND FLOOR IIIRD B 2 NEHRU NAGAR GHAZIABAD UP 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | - | - | Rejected-Technical NON RESPONSIVE |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
Tender Value
₹7.4 Cr
EMD Value
₹14.8 L
Closing Date
10 Dec 2019, 12:00 pmClosed
SE BAREILLY CIRCLE PWD BAREILLY
OFFICE OF SE BAREILLY CIRCLE PWD BAREILLY
Construction of fourlane widening of Bareilly Mod to Garra Bridge (ODR) in Distt. Shahjahanpur (Length 1.80 Km.)
2019_CEBLY_405883_1
10004/141C(E Tender-7)-3/19-20 DATE 11.11.19
Open Tender
Civil Works - Roads
Item Rate
180 days
SHAHJAHANPUR
Please refer SBD (STANDARD BIDDING DOCUMENT)
3 documents required · 3 mandatory
₹2,725
EE PD PWD SHAHJAHANPUR
₹14.8 L
22/11/2019
29 Feb 2020
21 Nov 2019
11 Dec 2019
21 Nov 2019
10 Dec 2019
21 Nov 2019
22 Nov 2019
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts.
Construction of Embankment with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compacted to meet requirement of table 300-2, MORT&H Specification-305 (carted earth 2.00Km.)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as MoRTH specification clause 406. (Wet Mix Macadam 3.50% emulsion+1% cement) Stabilized WMM
Providing & applying Tack coat with bitumen emulsion using pressure distributor at the rate of 0.30 kg. Per sqm. On the prepared bituminous/ granular surface cleaned with mechanical broom. As per MORT&H Specification clause. 503
Providing and laying bituminious concrete with HMP 60-90 TPH producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% minimum as per job mix, and filler, transporting the hot mix to work site,laying with a Machnical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5(M-25)
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications.
Supply and laying of 100 mm dia pvc pipe. SOR No. 24.
Painting Colur Washing With Priming. And Wall Putti.(SI 660+661+DSR 13.26)
Earthwork in excavation of foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick masonry work in 1:3 cement mortar in Sub Structure complete excluding pointing and plastering, as per drawing and technical specification.
Supply and filling Local sand as a filter material in abutments including all materials labour T&P cartge staking etc. complete. SOR No. 6(II).
Pointing with cement mortar (1:3) on brick work in sub structure as per drawing and technical specification Clauses 613.3 & 1204.
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (600 mm dia)
M/s VERMA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .