Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.1 L
EMD Value
₹24,500
Closing Date
19 Oct 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE JSV Division at Sunni
EE JSV Division at Sunni
C/O Intake chamber , C/O storage tank, P/L/J of pipe line C/o Protection wall
2026_HPIPH_145438_1
SNN-SML-003-740-Tdr-26-49-55dt 08.10.26
Open Tender
Civil Works - Water Works
Item Rate
90 days
Sunni
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹24,500
9 Oct 2026
9 Oct 2026
19 Oct 2026
9 Oct 2026
19 Oct 2026
9 Oct 2026
9 Oct 2026 - 19 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Description | - | - | - | - |
| 3 | Cutting in Earth work and disposal of excavated earth upto a lead of 20 meters . Spade Work , Pick Work , & Jumper Work | 11.25 | Cum | 1.25 | ₹14.06 |
| 4 | Excavation in foundations, trenches etc. in earth work, lift up to 1.50 mtrs. stacking the excavated soil not more than 3 mtrs. clear from the as of excavation and then returning the excavated soil in 15 cm. layers when required into plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 20 mtrs.- P-J Work. | - | - | - | - |
| 5 | For civil work | 76.36 | Cum | - | - |
| 6 | For pipe line | 97.5 | Cum | - | - |
| 7 | Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in:- | - | - | - | - |
| 8 | Foundation and Plinth | 4.69 | Cum | - | - |
| 9 | Providing and laying cement concrete 1:1.5:3 ( 1 cement : 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | - | - | - | - |
| 10 | Foundation and Plinth | 4.72 | Cum | - | - |
| 11 | ii) Walls (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level. | 7.36 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
FORM-8.pdf
Tender Documents • 0.62 MB
BOQ_216589.xls
BOQ • 0.33 MB
terms.pdf
Tender Documents • 0.10 MB
FORM6.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .