Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹25.0 L (10.1%)Rejected-Finance | ₹2.7 Cr+₹25.0 L (10.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.9 Cr+₹43.3 L (17.4%)Rejected-Finance | ₹2.9 Cr+₹43.3 L (17.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.2 Cr+₹67.0 L (26.9%)Rejected-Finance | ₹3.2 Cr+₹67.0 L (26.9%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.3 Cr+₹80.8 L (32.5%)Rejected-Finance | ₹3.3 Cr+₹80.8 L (32.5%) | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
10 Jan 2020, 3:00 pmClosed
Deputy General Manager Technical
Southern Region Pipelines, Indian Oil Corporation Ltd., Pipelines Division, House of Four Frames, 6 13, Wheat Croft Road, Nungambakkam, Chennai 600034
CONSTRUCTION OF PRE ENGINEERED STRUCTURAL STEEL STORAGE SHED SIZE 54M X 12M INSIDE THE PIPELINE STOCK YARD LAND AT COIMBATORE MARKETING TERMINAL FOR CITY GAS DISTRIBUTION PROJECT COIMBATORE GA
2019_SRCHN_108461_1
SRP19TS067
Open Tender
Civil Works
Works
180 days
COIMBATORE
Please refer Tender documents.
6 documents required · 6 mandatory
₹3.1 L
Yes
SRPL, CHENNAI
1 Aug 2020
21 Dec 2019
11 Jan 2020
21 Dec 2019
10 Jan 2020
28 Dec 2019
27 Dec 2019
Indian Oil Corporation eProcurement portal Created By: REHANA S KRISHNAN Created Date/Time: 17-Apr-2020 12:42 PM Tender Title: CONSTRUCTION OF PRE ENGINEERED STRUCTURAL STEEL STORAGE SHED SIZE 54M X 12M INSIDE THE PIPELINE STOCK YARD LAND AT COIMBATORE MARKETING TERMINAL FOR CITY GAS DISTRIBUTION PROJECT COIMBATORE GA Tender ID: 2019_SRCHN_108461_1
Tender Inviting Authority: Deputy General Manager (T), Indian Oil Corporation Limited (Pipelines Division), Southern Region Pipelines
Name of Work: CONSTRUCTION OF PRE-ENGINEERED STRUCTURAL STEEL SHED STORAGE SHED (SIZE 54M X 12M) INSIDE THE PIPELINE STOCK YARD LAND AT COIMBATORE MARKETING TERMINAL FOR CITY GAS DISTRIBUTION PROJECT-COIMBATORE GA
Tender No: SRP19TS067
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 R.Selvaraj 26042631.20 2.70 26745782.24 Two Crore Sixty Seven Lakh Fourty Five Thousand Seven Hundred and Eighty Two
2.00 Rainbow Construction 26042631.20 -19.10 21068488.64 Two Crore Ten Lakh Sixty Eight Thousand Four Hundred and Eighty Eight
3.00 K KUMAR RAJA PROJECTS PVT LIMITED 26042631.20 -5.01 24737895.38 Two Crore Fourty Seven Lakh Thirty Seven Thousand Eight Hundred and Ninty Five
4.00 SRI VINAYAGA ENGINEERING CONTRACTORS 26042631.20 14.00 29688599.57 Two Crore Ninty Six Lakh Eighty Eight Thousand Five Hundred and Ninty Nine
5.00 M/s. Jayant N. Devkar Construction 26042631.20 7.20 27917700.65 Two Crore Seventy Nine Lakh Seventeen Thousand Seven Hundred
6.00 BDS PROJECTS 26042631.20 12.75 29363066.68 Two Crore Ninty Three Lakh Sixty Three Thousand Sixty Six
7.00 SRI VIGNESH ENTERPRISES 26042631.20 -10.95 23190963.08 Two Crore Thirty One Lakh Ninty Thousand Nine Hundred and Sixty Three
Lowest Amount Quoted BY: Rainbow Construction(21068488.64)
BOQ Summary Details Tender Title: CONSTRUCTION OF PRE ENGINEERED STRUCTURAL STEEL STORAGE SHED SIZE 54M X 12M INSIDE THE PIPELINE STOCK YARD LAND AT COIMBATORE MARKETING TERMINAL FOR CITY GAS DISTRIBUTION PROJECT COIMBATORE GA Tender ID: 2019_SRCHN_108461_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Rainbow Construction 21068488.64 L1
2 SRI VIGNESH ENTERPRISES 23190963.08 L2
3 K KUMAR RAJA PROJECTS PVT LIMITED 24737895.38 L3
4 R.Selvaraj 26745782.24 L4
5 M/s. Jayant N. Devkar Construction 27917700.65 L5
6 BDS PROJECTS 29363066.68 L6
7 SRI VINAYAGA ENGINEERING CONTRACTORS 29688599.57 L7
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .