| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-Finance | ₹3.6 Cr | L1 | Accepted-Finance L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
Tender Value
₹5.0 Cr
EMD Value
₹9.9 L
Closing Date
7 Sept 2020, 5:00 pmClosed
Empowered Officer,SRRDA,PMGSY
Office of the Empowered Officer,SRRDA,PMGSY Cell Lower Lachumiere,Meghalaya,Shillong-793001
MBT
2020_CEMEG_98493_1
MG5/02/
Open Tender
Civil Works - Roads
Item Rate
270 days
Mibonpara
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
Empowered Officer, SRRDA, Meghalaya
₹9.9 L
Yes
Shillong
5 Oct 2020
27 Aug 2020
8 Sept 2020
27 Aug 2020
7 Sept 2020
27 Aug 2020
27 Aug 2020 - 31 Aug 2020
31 Aug 2020
Amount
Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201.
Restoration of Rain Cuts
Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and technical specifications Clause 1902
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Granular Sub-base with Well Graded Material (A).By Mix in Place Method (ii).For Grading II Material
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Water Bound Macadam Sub-base/base
2).WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and broomingetc.
3).WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
Bituminous Work
Prime Coat (ii) Medium porosity Providing and applying primer coat with bitumen emulsion ( SS-1) on prepared surface of granular base including cleaning of road surface etc.
Tack Coat (ii).Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Premix carpet 20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2 (Cold Mix)
Seal Coat (II) Providing and laying seal coat using Bitumen Emulsion (COLD MIX)
Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual Means (i).Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m
For stone -
For GSB -
For Binding materials -
(iii).Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m
For stone -
For GSB -
For Binding materials -
Loading and Unloading of Bitumen drum by Manual Means to lead 30.00m
(i). Loading of bitumen drum by manual means to lead 30.00m
(ii). Unloading of bitumen drum by manual means to lead 30.00m
Haulage excluding Loading & Unloading Haulage of materials by tipper excluding cost of loading, unloading and stacking.
For stone -
Case-I : Surfaced Road
Case-III: Katcha Track
For GSB -
Case-I : Surfaced Road
Case-III: Katcha Track
Binding materials =
Case-I : Surfaced Road
Case-III: Katcha Track
Bitumen
Case-I : Surfaced Road
Case-III: Katcha Track
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600 mm Equilateral Triangle
iii) 600 mm Circular
Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
Construction of 5th Kilometre Stone (Precast) : Reinforced cement concrete M 15 grade 5th Kilometre stone with local stone of standard design as per IRC : 8 fixingin position including painting and printing etc. as per drawing and Technical Specification Clause 1703
Construction of Ordinary Kilometre Stone (Precast) : Reinforced cement concrete M 15 grade ordinary Kilometre stone with local stone of standard design as per IRC : 8 fixingin in position including painting and printing etc. as per drawing and Technical Specification Clause 1703
Construction of 200 Metre Stone (Precast) : Reinforced cement concrete M 15 grade 200 metre stone with local stone of standard design as per IRC : 8 fixingin in position including painting and printing etc. as per drawing and technical specification Clause 1703
Construction of reference pillars as per Fig. 1600.1 (b) as per drawing and Technical Specification Clause 1602.1
CD WORKS I/C DAMAGED WING WALL
Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material.
Bedding for pipe (i) Type A Bedding Laying concrete cradle bedding with M15 Grade Cement Concrete as per clause 1105
Providing and laying RCC Pipe NP3 concrete pipe as per design in single row Providing and laying RCC Pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concerete and masonry works in head walls and parapates Clause 1106.
Plain cement concrete M10 (1:3:6) in levelling course below open foundation of head walls as per drawings and Technical specificatio Clause 1109
Stone Masonry Work in cement mortar(1:3) in foundation of head walls complete as per drawing and Technical Specification Clause 1109 (A) In 1:4 cement mortar
Providing weep holes in brick/stone masonry, plain/reinforced concrete abutment, wing walls, return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1(V):20(H) towards drawing face complete as per drawing and Technical Specification Clause 614, 709, 1204.3.7
Plastering with Cement Mortar (1:3) 15 mm thick on brickwork in parapet as per Technical Specification Clauses 613.4 and 1208.4. (WING WALL)
CD WORKS
Backfilling behind abutment wall, wing wall and return wall complete as per drawing and technical specification B )Sandy material
Loading and unloading of stone boulder/ stone aggregates /sand
(Placing tipper at loading point , loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip)
Dismantling of existing structure like culverts,bridges,retaining wall and other structure comprising of stone masonry,including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per technical specification Clause 202 B) Rubble Stone Masonry in Cement Mortar
Haulage excluding Loading & Unloading Haulage of materials by tipper excluding cost of loading, unloading and stacking.
For stone -
Case-I : Surfaced Road
Case-III: Katcha Track
For Sand -
Case-I : Surfaced Road
Case-III: Katcha Track
For stone -
Case-I : Surfaced Road
Case-III: Katcha Track
For Sand -
Case-I : Surfaced Road
Case-III: Katcha Track
STONE MASONARY DRAIN
Excavation in Structures Earthwork in excavation for foundation of structures upto 3.00 m depth as per drawing and technical specification Clause 1104 including setting out etc. complete
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (i) P.C.C grade M 10 (1:3:6)
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 (iii) Random rubble masonry (ii) In cement mortar (1:4)
plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual Means
(i).Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m a) stone -
ii) Loading of earth,sand, moorum etc by manual means including a lead upto 30m a) sand -
(iii).Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m a) stone -
ii) Unloading of earth,sand, moorum etc by manual means including a lead upto 30m a) sand -
Loading and unloading of cement by manual means (i) Loading of cement by manual maeans including a lead of upto 30.00m (a) Cement
(ii)Unloading of cement by manual maeans including a lead of upto 30.00m
Haulage excluding Loading & Unloading Haulage of materials by tipper excluding cost of loading, unloading and stacking.
For stone -
Case-I : Surfaced Road
Case-III: Katcha Track
For Sand -
Case-I : Surfaced Road
Case-III: Katcha Track
For Cement -
Case-I : Surfaced Road
Case-III: Katcha Track
RETAINING WALL/BREAST WALL
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i).Upto 3 m depth
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 III.Random rubble masonry (ii).In cement mortar (1:4)
Providing weep holes in brick masonry,plain/reinforced concrete abutment,wing wall,return wall with AC pipe entending through the full width of the structure with slope of 1 ( V) : 20 (H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 of specification of Rural Roads
Back filling behind abutment , Wing wall,and return wall complete sa per drawing and technical specification, Clause 1204.3.8
Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual Means
(i).Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m a) stone -
ii) Loading of earth,sand, moorum etc by manual means including a lead upto 30m a) sand -
(iii).Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m a) stone -
ii) Unloading of earth,sand, moorum etc by manual means including a lead upto 30m a) sand -
Loading and unloading of cement by manual means
(i) Loading of cement by manual maeans including a lead of upto 30.00m (a) Cement
(ii)Unloading of cement by manual maeans including a lead of upto 30.00m
Haulage excluding Loading & Unloading Haulage of materials by tipper excluding cost of loading, unloading and stacking.
For stone -
Case-I : Surfaced Road
Case-III: Katcha Track
For Sand -
Case-I : Surfaced Road
Case-III: Katcha Track
For Cement -
Case-I : Surfaced Road
Case-III: Katcha Track
Construction of unlined surface drain of average cross-sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and Technical Specification Clause 307. Excavated material to be used in embankment at site.
Maintenance
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year Renewal Plan
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .