Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.0 CrAccepted-Finance | ₹54.0 Cr | L1 | Accepted-Finance Quoted Value is Low |
| 2 | L2₹56.2 CrRejected-Finance D55 BALUCHAMY STREET THIRUNAGAR 4TH STOP MADURAI 625006 | MADURAI | MADURAI | TAMIL NADU | 625006 | ₹56.2 Cr | L2 | Rejected-Finance Quoted Value is High |
| 3 | L3₹58.3 CrRejected-Finance E 30 2ND FLOOR 2ND AVENUE BESANT NAGAR CHENNAI 600 090 | CHENNAI | TAMIL NADU | 600090 | ₹58.3 Cr | L3 | Rejected-Finance Quoted Value is High |
Tender Value
₹53.5 Cr
EMD Value
₹26.9 L
Closing Date
7 Feb 2026, 11:00 amClosed
SE (H) C and M Chennai Circle
O/o the SE (H) C and M Chennai Chennai Teynampet Chennai-06
Widening from Two Lane to Four Lane and Strengthening at km 31.8_3.0 and 42.4_47.0 of Chittoor Thiruttani Road Including Reconstruction of Box Culvert ,Widening of Box Culvert and Construction of Centre Median
2026_HWAY_645195_1
TN.64/Sl.No.03/TVLR/CRIDP Work 2026-27(Advance Sanction)
Open Tender
Civil Works - Highways
450 days
Thiruvallur
Please Refer Tender Documents
24 documents required · 24 mandatory
₹0
₹26.9 L
7 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
7 Feb 2026
31 Jan 2026
23 Jan 2026 - 28 Jan 2026
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Boxing including conveyance of sut earth away from the site with average lead
Main work
Sub Estimate - VIII
Providing compaction for embankment /makingup of low berms using the available boxcut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.
Main work
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus rplus materials etc., complete as per standard specification. For embankment / sub grade using CBR 8
Main work
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, ncluding premixing the materials with water at OMC in mechnanical mixplant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Grade -V Material
Main work
Sub Estimate - VIII
Main work
Sub Estimate - VIII
Main work
Sub Estimate - VIII
Main work
Sub Estimate - VIII
Main work
Sub Estimate - VIII
Main work
Sub Estimate - VIII
Main work
Sub Estimate - VIII
Main work
Sub Estimate - VIII
Main work
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Sub Estimate - VIII
Sub Work: (i) Reconstruction of Triple Cell (3X3) Box Culvert at Km 33/8 of Chittoor - Tiruttani Road (SH-54). (ii) Reconstruction of Double CELL Box Culvert of 2x2 At Km 35/4, 35/8, 43/6 & 46/8 of Chittoor - Tiruttani Road (SH-54). (iii) Reconstruction of Single CELL Box Culvert of 3X3 At Km 42/6(i) of Chittoor - Tiruttani Road (SH-54). (iv) Reconstruction of Single CELL Box Culvert of 2x2 At Km 31/10, 34/2, 34/6, 34/10, 36/6, 42/6(ii), 42/8, 42/10, 43/10, 44/4, 45/6 & 45/10. of Chittoor - Tiruttani Road (SH-54). (v) Widening of Single CELL Box Culvert of 2x2 at Km 32/2, 32/8, 36/8, 43/2(i), (ii), 44/6 & 45/8 of Chittoor-Thiruthani Road (SH54). (vi) Widening of Single cell Box Culvert of 1X1 at Km 31/8, & 44/2 of Chittoor-Thiruthani Road (SH54). (vii) Construction of Kerb type median at Km 31/8 - 37/0 & 42/4 - 47/0 of Chittoor - Tiruttani Road (SH54). (viii) Providing Bus lay bye, Branch road in between Km 31/8 - 37/0 & 42/4 – 47/0 of Chittoor - Thiruthani Road (SH54). (ix) Construction of Drain at Km 46/500 - 47/0 (BHS) of Chittoor - Tiruttani road. (x) Providing Road Furnitures in between Km 31/4 - 37/0 & 42/4 – 47/0 of Chittoor - Thiruthani Road (SH54).
Sub Estimate - I
Sub Estimate - II
Sub Estimate - III
Sub Estimate - IV
Sub Estimate - V
Sub Estimate - VI
Sub Estimate - I
Sub Estimate - II
Sub Estimate - III
Sub Estimate - IV
Sub Estimate - V
Sub Estimate - VI
Sub Estimate - IX
Sub Estimate - IX
Sub Estimate - I
Sub Estimate - II
Sub Estimate - III
Sub Estimate - IV
Sub Estimate - V
Sub Estimate - VI
Sub Estimate - IX
Sub Estimate - IX
Sub Estimate - I
Sub Estimate - II
Sub Estimate - III
Sub Estimate - IV
Sub Estimate - V
Sub Estimate - VI
Sub Estimate - I
Sub Estimate - II
Sub Estimate - III
Sub Estimate - IV
Sub Estimate - V
Sub Estimate - VI
Sub Estimate - IX
Sub Estimate - I
Sub Estimate - III
Sub Estimate - IX
Sub Estimate - IX
Sub Estimate - VII
Sub Estimate - VII
Sub Estimate - VII
Sub Estimate - VII
Sub Estimate - I
Sub Estimate - II
Sub Estimate - III
Sub Estimate - IV
Sub Estimate - V
Sub Estimate - VI
Sub Estimate - I
Sub Estimate - II
Sub Estimate - III
Sub Estimate - IV
Sub Estimate - V
Sub Estimate - VI
Sub Estimate - I
Sub Estimate - I
Sub Estimate - II
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X 90 cm equilateral triangle
Sub Estimate - X 90 cm octagon.
Sub Estimate - X 60 cm circular.
Sub Estimate - X 60 cm x 45 cm rectangular.
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Sub Estimate - X
Calculation of SubTotal, GST and Total Amount carried out by system automatically
Basic cost of value put to tender as per estimate
Add GST at 18%
Total Value put to Tender
Quoted value
Final Quoted Value
Add GST at 18% of Final Quoted Value
Total Value of Contract Including 18% of GST
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
PQ.pdf
Tender Documents • 0.59 MB
Pricebid.pdf
Tender Documents • 0.58 MB
BOQ_773214.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid