Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -26.52% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | Not Admitted-PreQual/Technical | - | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.7 L
EMD Value
₹7,315
Closing Date
22 Jun 2026, 6:00 pmClosed
Sr DGM Bhilwara
Sr DGM Bhilwara
Plantation with 5 year Maintenance at Industrial Area Growth Center Hamirgarh
2026_RIICO_566773_5
BHL/2026-27/14
Open Tender
Civil Works
Percentage
RIICO Bhilwara
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
RIICO
₹7,315
21 Jul 2026
11 Jun 2026
23 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 182.25 | Cum | 178 | ₹32,440.5 |
| 1.02 | 2, Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc., Good soil of earth | 121.5 | Cum. | 240 | ₹29,160 |
| 1.03 | Maintenace of Plants by the contractor including of pits/bids watering preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security if the plant die during maintenance contractor has to replace same height plant at his own cost | 15,000 | Per Plant Per month | 18 | ₹2,70,000 |
| 1.04 | Maintenance of lawn, Spreading of manure , good earth in required thickness (cost of manure and good earth to be separately ) | 121.5 | cub | 24 | ₹2,916 |
| 1.05 | 2, Different varieties of Shady plants, Height 5'-6' Many Branches | 250 | Each | 125 | ₹31,250 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_1008432.xls
BOQ • 0.31 MB
PlantCondationGSchedule.pdf
Additional Documents • 0.25 MB
TDPlantGC.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].