Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,020
Closing Date
19 Oct 2026, 4:00 pmClosed
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Stabilization of intake Raw water main by way of providing and laying of HDPE pipeline for the damaged portion in Bota Mali for WSS G.G Sheikh Tulail
2026_PWDJK_327813_1
3rd Call PHE E-NIT No 22 of 2026-27 EE-Hyd-Grz-1087-92 E-tendering Dated-10-10-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Hydraulic Division Gurez
₹7,020
Executive Engineer Hydraulic Division Gurez
12 Oct 2026
12 Oct 2026
20 Oct 2026
12 Oct 2026
19 Oct 2026
12 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 metre from cutting edge.:All kinds of Soil. | 248.4 | Cum | 479.3 | ₹1,19,058.12 |
| 1.01 | Ordinary Rock. | 62.1 | Cum | 924.8 | ₹57,430.08 |
| 2 | Laying and fitting of G.I / HDPE pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 75mm Dia HDPE Pipe. | 1,350 | RM | 41 | ₹55,350 |
| 3 | 20mm Dia HDPE Pipe. | 550 | RM | 14.1 | ₹7,755 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m. | 223.56 | Cum | 218.4 | ₹48,825.5 |
| 5 | Add Cost of Pipe Specials and Fittings. (To be paid as per actual voucher). | 1 | Job | 15,000 | ₹15,000 |
| 6 | Removing of Tree Roots during pipeline trench excavation. Only the roots obstructing the trench excavation, not felling of trees or unauthorised cutting of major structure. Complete Job (Lump Sum) | 1 | Job | 42,000 | ₹42,000 |
| 7 | Carriage of Materials by Mechanical Transport including loading, unloading and stacking.Pipes Average Lead of 160km. | 2.11 | MT | 1,737.73 | ₹3,666.61 |
| 8 | Carriage of Materials By Manual Transport including loading, unloading and stacking.Pipes average lead of 1200 m. | 2.11 | MT | 1,092.1 | ₹2,304.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1109471.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .