Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC | ₹21.8 L Quoted ₹22.9 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹24.6 L+₹1.7 L (7.20%)Rejected-AOC TUPKHANA PART 1 PO ARUNACHAL PS SILCHAR DIST CACHAR ASSAM 788025 | CACHAR | ASSAM | 788025 | ₹24.6 L+₹1.7 L (7.20%) | L2 | Rejected-AOC Being L2 |
| 3 | L3₹24.7 L+₹1.7 L (7.52%)Rejected-AOC C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | ₹24.7 L+₹1.7 L (7.52%) | L3 | Rejected-AOC Being L3 |
| 4 | L4₹24.7 L+₹1.8 L (7.67%)Rejected-AOC | ₹24.7 L+₹1.8 L (7.67%) | L4 | Rejected-AOC Being L4 |
| 5 | L5₹24.7 L+₹1.8 L (7.69%)Rejected-AOC | ₹24.7 L+₹1.8 L (7.69%) | L5 | Rejected-AOC Being L5 |
| Sl No | Description | Qty | Unit | M/S TAPAN KUMAR RAY L4 | MS AFTAB LASKAR L7 | MS AFTAB LASKAR L7 | M/S M P Sharma L8 | Bhuiya Construction L3 | m/s builders and suppliers L6 | Anup Kumar Paul Choudhury L9 | M/S R A ENTERPRISE L2 | SHRI YOUNUS KHAN L5 | M/S MOLOY KUMAR DEY L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00E & M Division Items | |||||||||||||
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, laying of pipes, cables, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out soft/loose soil complete all as specified and directed. | 65 | Cum | 270 ₹17,550 | 280 ₹18,200 | 280 ₹18,200 | 285 ₹18,525 | 261 ₹16,965 Lowest | 290 ₹18,850 | 299 ₹19,435 | 300 ₹19,500 | 277 ₹18,005 | 270 ₹17,550 |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and directed. | 56 | Cum | 210 ₹11,760 Lowest | 243 ₹13,608 | 243 ₹13,608 | 225 ₹12,600 | 228 ₹12,768 | 235 ₹13,160 | 249 ₹13,944 | 230 ₹12,880 | 230 ₹12,880 | 220 ₹12,320 |
| 4.00 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 9 | Cum | 252 ₹2,268 | 250 ₹2,250 | 250 ₹2,250 | 264 ₹2,376 | 256 ₹2,304 | 260 ₹2,340 | 248.6 ₹2,237.4 Lowest | 270 ₹2,430 | 260 ₹2,340 | 250 ₹2,250 |
| 5.00 | M&L for PCC 1:2:4 type B1 (Using 20mm graded stone aggregate) as in Path cutting, supporting for pipes etc complete all as specified and directed. | 2 | Cum | 11,600 ₹23,200 | 10,900 ₹21,800 | 10,900 ₹21,800 | 11,400 ₹22,800 | 11,700 ₹23,400 | 11,300 ₹22,600 | 11,500 ₹23,000 | 12,000 ₹24,000 | 11,000 ₹22,000 | 8,500 ₹17,000 Lowest |
| 6.00 | Material and Labour for (cold bitumin) for filling/repair of road cutting with road patch material ready mix with minimum residual bitumin constant by weight of mix 4.5%, No heating required, No sticking on tyres etc all as specified and directed by Engr-in-Charge | 2 | Cum | 41,600 ₹83,200 | 41,800 ₹83,600 | 41,800 ₹83,600 | 41,500 ₹83,000 | 41,550 ₹83,100 | 41,900 ₹83,800 | 41,700 ₹83,400 | 42,000 ₹84,000 | 41,400 ₹82,800 | 38,000 ₹76,000 Lowest |
| 7.00 | Supplying, laying, jointing & testing galvanised steel tubing 100 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 63 | RM | 2,430 ₹1,53,090 | 2,400 ₹1,51,200 | 2,400 ₹1,51,200 | 2,360 ₹1,48,680 | 2,450 ₹1,54,350 | 2,370 ₹1,49,310 | 2,420 ₹1,52,460 | 2,380 ₹1,49,940 | 2,390 ₹1,50,570 | 2,300 ₹1,44,900 Lowest |
| 8.00 | Supplying, laying, jointing & testing galvanised steel tubing 80 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 48 | RM | 1,710 ₹82,080 | 1,730 ₹83,040 | 1,730 ₹83,040 | 1,750 ₹84,000 | 1,770 ₹84,960 | 1,680 ₹80,640 | 1,720 ₹82,560 | 1,690 ₹81,120 | 1,740 ₹83,520 | 1,600 ₹76,800 Lowest |
| 9.00 | Supplying, laying, jointing & testing galvanised steel tubing 50 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 180 | RM | 1,150 ₹2,07,000 | 1,133 ₹2,03,940 | 1,133 ₹2,03,940 | 1,110 ₹1,99,800 | 1,090 ₹1,96,200 | 1,100 ₹1,98,000 | 1,140 ₹2,05,200 | 1,080 ₹1,94,400 | 1,120 ₹2,01,600 | 1,000 ₹1,80,000 Lowest |
| 10.00 | Supplying, laying, jointing & testing galvanised steel tubing 40 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 80 | RM | 915 ₹73,200 | 925 ₹74,000 | 925 ₹74,000 | 935 ₹74,800 | 911 ₹72,880 | 940 ₹75,200 | 920 ₹73,600 | 950 ₹76,000 | 930 ₹74,400 | 800 ₹64,000 Lowest |
Tender Value
₹21.8 L
EMD Value
₹43,600
Closing Date
27 May 2026, 6:00 pmClosed
GE SILCHAR
Office of the GE Silchar Masimpur Cantt
REPAIR/MAINTENANCE OF EXTERNAL WATER SUPPLY INCL MAINT OF FILTERATION PLANT AT TURIAL WATER POINT AT AIZAWL MIL STN
2026_MES_763401_1
8149A/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Aizawl
Class E Category a ii and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹43,600
Yes
30 Jul 2026
5 May 2026
30 May 2026
5 May 2026
27 May 2026
20 May 2026
5 May 2026 - 15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E & M Division Items | - | - | - | - |
| 2 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, laying of pipes, cables, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out soft/loose soil complete all as specified and directed. | 65 | Cum | - | - |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and directed. | 56 | Cum | - | - |
| 4 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 9 | Cum | - | - |
| 5 | M&L for PCC 1:2:4 type B1 (Using 20mm graded stone aggregate) as in Path cutting, supporting for pipes etc complete all as specified and directed. | 2 | Cum | - | - |
| 6 | Material and Labour for (cold bitumin) for filling/repair of road cutting with road patch material ready mix with minimum residual bitumin constant by weight of mix 4.5%, No heating required, No sticking on tyres etc all as specified and directed by Engr-in-Charge | 2 | Cum | - | - |
| 7 | Supplying, laying, jointing & testing galvanised steel tubing 100 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 63 | RM | - | - |
| 8 | Supplying, laying, jointing & testing galvanised steel tubing 80 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 48 | RM | - | - |
| 9 | Supplying, laying, jointing & testing galvanised steel tubing 50 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 180 | RM | - | - |
| 10 | Supplying, laying, jointing & testing galvanised steel tubing 40 mm bore medium grade with screwed joint together with all fitting such as bends, elbows,tees,short pieces and union etc laid in trenches/fixed to wall,cieling,floor etc including taking out old unserviceable,cracked steel tubing including all fittings complete all as specified and directed.
Note:- Earth work shall be measured and paid separately under respective items of BOQ | 80 | RM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_855105.xls
BOQ • 0.38 MB
8149A-SchOfCreditformat.pdf
Additional Documents • 0.03 MB
8149A-TP.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .