Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹1.1 Cr+₹36,215.90 (0.33%)Rejected-AOC | ₹1.1 Cr+₹36,215.90 (0.33%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Kannan Contractor L1 | Alagesan Contractor L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road From Singarappettai - Thiruppathur BT road to Gedaganur road km 0/0 - 2/980 - Rs.118.480 Lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 3,208.25 | Sqm | 6.35 ₹20,372.39 Lowest | 6.37 ₹20,436.55 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 3,713.33 | Sqm | 23.33 ₹86,631.99 Lowest | 23.41 ₹86,929.06 |
| 4.00 | Colelction and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc complete for shoulders | 1,002.58 | Cum | 340.66 ₹3,41,538.9 Lowest | 341.78 ₹3,42,661.79 |
| 5.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 6.00 | Km 0/0-1/0 | 468.75 | Cum | 2,666.74 ₹12,50,034.38 Lowest | 2,675.55 ₹12,54,164.06 |
| 7.00 | Km 1/0-2/0 | 466.41 | Cum | 2,666.74 ₹12,43,794.2 Lowest | 2,675.55 ₹12,47,903.28 |
| 8.00 | Km 2/0-2/980 | 457.31 | Cum | 2,666.74 ₹12,19,526.87 Lowest | 2,675.55 ₹12,23,555.77 |
| 9.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it. | |||||
| 10.00 | Km 0/0-2/980 | 11,139.75 | Sqm | 84.86 ₹9,45,319.19 Lowest | 85.14 ₹9,48,438.32 |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
3 Sept 2025, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Strengthening of the road From Singarappettai - Thiruppathur BT road to Gedaganur road km 0_0 - 2_980 in Krishnagiri DT Uthangarai Block Under MGSMT III 2025-2026 Package No TN 04 KRI 176
2025_RDTN_594581_1
RocNo_4253_2025_R3_13_08_2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Uthangarai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.2 L
DRDA Krishnagiri
14 Oct 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
28 Aug 2025
Amount
Strengthening of the road From Singarappettai - Thiruppathur BT road to Gedaganur road km 0/0 - 2/980 - Rs.118.480 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Colelction and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc complete for shoulders
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat WMM Surface (treated with primer) at 2.5 KG of RS-1 Bitumen Emulsion / 10 Sqm including labour for spraying, hire charges for bitumen sprayer etc., comp
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 (USING PLASTIC WASTE)
Provision of 15 nos. rumble strips covered with premium bituminous carpet, 15-20mm high at centre at approved locations to control speed, marked with white strips of road marking paint
Provision for H.M.Stone
Provision for KM Stones
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Alagesan Contractor (BID ID -1447047)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .