| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.6 LAdmitted-Finance | -21.38% | ₹23.6 L | L1 | Admitted-Finance |
| 2 | L2₹23.7 L+₹11,700.03 (0.50%)Admitted-Finance | -20.99% | ₹23.7 L+₹11,700.03 (0.50%) | L2 | Admitted-Finance |
| 3 | L3₹25.5 L+₹1.9 L (8.11%)Admitted-Finance | -15.00% | ₹25.5 L+₹1.9 L (8.11%) | L3 | Admitted-Finance |
| 4 | L4₹26.7 L+₹3.1 L (13.1%)Admitted-Finance | -11.11% | ₹26.7 L+₹3.1 L (13.1%) | L4 | Admitted-Finance |
| 5 | L5₹33.3 L+₹9.8 L (41.4%)Admitted-Finance | +11.13% | ₹33.3 L+₹9.8 L (41.4%) | L5 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
6 Aug 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_318328_2
e-NIT No. 24 of REW Poonch 2026-27 Dated 28-07-2026
Open Tender
Civil Works
Percentage
180 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer REW Division Poonch
₹60,000
29 Aug 2026
28 Jul 2026
7 Aug 2026
28 Jul 2026
6 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 76.78 | cum | 256.85 | ₹19,720.94 |
| 2 | Providing and Dumping of Stones | 23.31 | cum | 937.9 | ₹21,862.45 |
| 3 | Provision for site clearance and Ground leveling | 1 | No | 10,000 | ₹10,000 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:5:10 (1Cement: 4 fine sand: 8 graded stone aggregate 40mm nominal Size) | 15.71 | cum | 4,826.5 | ₹75,824.32 |
| 5 | Providing and laying in position specified Grade of Reinforced cement concrete excluding the cost of centring, shutering and finishing of all work.1:1.5:3 (1 Cement : 1.5 Coarse sand : 3
Graded stone aggregates 20 mm nominal size) Raft | 14.93 | cum | 7,788.4 | ₹1,16,280.81 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 19.69 | cum | 9,821.85 | ₹1,93,392.23 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 3,208.8 | kg | 115.35 | ₹3,70,135.08 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:3:6 (1Cement: 3 COARSE sand: 6 graded stone
aggregate 20mm nominal Size) | 48.44 | cum | 5,733.6 | ₹2,77,735.58 |
| 9 | Providing and Laying Damp Proof course 50 mm thick with cement mortar in 1:2:4 mix, 20 mm nominal size of aggregate and curing complete. | 28.01 | sqm | 416.5 | ₹11,666.17 |
| 10 | Centering and shuttering including strutting propping etc. and removal of form work; Foundations, footings, bases of columns, mass concreting. | 177.41 | sqm | 286.35 | ₹50,801.35 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_1048103.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .