Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.5 Cr+₹6.6 L (1.46%)Admitted-Finance NAGAR NIGAM GORAKHPUR UTTAR PRADESH | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L2 | Admitted-Finance | ||
| 3 | L3₹4.7 Cr+₹18.0 L (4.03%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.7 Cr+₹20.8 L (4.63%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.7 Cr+₹21.3 L (4.76%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹7.8 Cr
EMD Value
₹15.6 L
Closing Date
7 Aug 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Chief Engineer Water Resources Zone Ban
Office of the Additional Chief Engineer Water Resources Zone Banswara (Raj.)
Construction of Padliya Anicut across Moren River GP Piplagunj Tehsil Obri District Dungarpur
2025_WRDAS_488480_1
NIT02/2025-2026
Open Tender
Civil Works
Percentage
365 days
OBRI
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
AS PER BID DOCUMENTS
₹15.6 L
Yes
Additional Chief Engineer WR Zone Banswara
28 Aug 2025
18 Jul 2025
8 Aug 2025
18 Jul 2025
7 Aug 2025
18 Jul 2025
29 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(a) Ordinary | 6,750 | sqm | 1.45 | ₹9,787.5 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) Hard / dense soil | 7,350 | cum | 95 | ₹6,98,250 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (c) Hard soil mixed with Kankar / boulders, Morrum | 3,675 | cum | 118 | ₹4,33,650 |
| 4 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.(a) Soft / Disintegrated rock | 3,307 | cum | 161 | ₹5,32,427 |
| 5 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (b) Hard rock not requiring blasting | 3,307 | cum | 241 | ₹7,96,987 |
| 6 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (c) Phylite & other hard rock requiring nominal blasting | 2,205 | cum | 346 | ₹7,62,930 |
| 7 | Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 3,124 | cum | 446 | ₹13,93,304 |
| 8 | Add extra over item No. 4 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. (a) Soft / Disintegrated rock | 368 | cum | 201 | ₹73,968 |
| 9 | Add extra over item No. 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. (b) Hard rock not requiring blasting. | 368 | cum | 301 | ₹1,10,768 |
| 10 | Add extra over item No. 6 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.(c)Phylite & other hard rock requiring nominal blasting | 245 | cum | 433 | ₹1,06,085 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.31 MB
Tenderdocument.pdf
Tender Documents • 2.68 MB
Tenderdocument_2.pdf
Tender Documents • 5.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .