Tender Value
₹89.7 L
EMD Value
₹1.8 L
Closing Date
2 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Exe Eng.Minor Irrigation Division, Hussainabad
Exe Eng.Minor Irrigation Division, Hussainabad
Renovation Work of Badka Bandh Block Naudiha Bazar DistPalamu
2026_WRD_115328_1
WRD/MID/HUSSAI/F2-03/26-27(2nd Call)
Open Tender
Civil Works
330 days
BLOCK NAUDIHA BAZAR, DISTT PALAMAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.8 L
18 Jun 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | E/W in stripping by hydraulic M/C in grade A & B type of soil including morroum soil, soil mixed with kankar, pebbles, boulders upto 300 mm size and disposal of the same along with all organic materials in the country side beyond 150M. upto 500 M in all by tipper including construction & maintenance of haul road etc. all complete as per specification and direction of E/I.
(SR No. WRD-5.1.6.1) | - | M3 | 88.35 | - | BI01010001010000000000000515BI0100001121 |
| 2 | Earth work in excavation of foundation trenches of toe wall,spillway,head regulator, outlet, intake well etc. as per designed section in all kinds of soil including moorum soil, soil mixed with kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50 m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 m as per specification and direction of E/l.(Vide Item No. - 5.1.14.1 of WRD Part -B ,Pg No.-99) | - | cum | 203.58 | - | BI01010001010000000000000515BI0100001122 |
| 3 | E/W in excavation and filling in canal by the hydraulic excavator as per designed section in ordinary soil (vide classification of soil item -A) and making the banks with excavated earth in proper profile and clod breaking and laying earth in 225 mm layers with initial lead of 10 m and all lifts all complete as per specification and direction of E/I (SR No.7.1.43.3)(WRD) | - | M3 | 60.48 | - | BI01010001010000000000000515BI0100001123 |
| 4 | E/W in excavation and filling in canal by the hydraulic excavator as per designed section in ordinary soil (vide classification of soil item -A) and making the banks with excavated earth in proper profile and clod breaking and laying earth in 225 mm layers upto 500 m and all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I.(SR No. 7.1.43.4)(WRD) | - | M3 | 115.04 | - | BI01010001010000000000000515BI0100001124 |
| 5 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of the excavated earth as obtained to a distance upto 50 m and average lift of 1.5 m including levelling , ramming the foundation trenches , removing the roots of shrubs etc all complete as per specification and direction of E/I
(SR No. WRD-7.1.27 ) | - | M3 | 151.23 | - | BI01010001010000000000000515BI0100001125 |
| 6 | Watering and consolidation of earth laid in 150mm to 225mm layers by manual labour with C.I.hammer to achieve minimum 85% of maximum dry density including supply of water and necessary tools and plants with all leads and lifts all complete as per specification and direction of E/I.
(SR No.- WRD-7.1.38) | - | M3 | 39.8 | - | BI01010001010000000000000515BI0100001126 |
| 7 | Supplying and laying sand filter on slope of the dam as per design, drawing, with watering and compaction including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.
(SR No.-WRD & Common-5.6.5) | - | M3 | 1,415.17 | - | BI01010001010000000000000515BI0100001127 |
| 8 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.
(SR No.WRD & Common-5.6.8) | - | M3 | 1,756.4 | - | BI01010001010000000000000515BI0100001128 |
| 9 | Earth work in bed clearance or desilting of canals carrying F.S. discharge between 8.5 cumecs (300 cusecs) and 0.14 cumecs (5 cusecs) and rennovation of pynes etc disposal of excavated earth etc. in ordinary soil including rough dressing with initial lead of 10M and lift of 1.5M as per specification and direction of E/I.
(SR Item No. WRD-7.1.20) | - | M3 | 120.61 | - | BI01010001010000000000000515BI0100001129 |
| 10 | Dismantling of masonry structures (dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of masonary , cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000meters.
(SR No.-Common-2.04(iii)B | - | M3 | 286.3 | - | BI01010001010000000000000515BI0100001130 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
ranchidocuments.pdf
Tender Documents • 4.28 MB
tenderdocuments.pdf
Tender Documents • 1.25 MB
BOQ_155925.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid