Tender Value
₹24.7 L
EMD Value
₹49,500
Closing Date
13 Jul 2026, 5:00 pm4d left
MUKESH KUMAR
Executive officer nagar parishad naugachia
NAUGACHIA
MUKESH KUMAR
EXECUTIVE OFFICER, NAGAR PARISHAD, NAUGACHIA
Construction of RCC Drain with Cover from House of Binod Yadav to Banarsi Yadav House AND Construction of RCC Drain with Cover & PCC Road from House of Banarsi Yadav to Subodh Yadav House in Ward No -- 13
135307
03/2026-2027/NAUGACHIA/GR 31
Open Tender
CIVIL
Bhagalpur
• VALID CLASS-IV REGISTRATION WITH RCD (As per NIT) (Attached or Not Attached)
• PAN CARD (As per NIT) (Attached or Not Attached)
• G.S.T. (As per NIT) (Attached or Not Attached)
• EARNEST MONEY (As per TENDER) (Attached or Not Attached)
• AFFIDAVIT (As per NIT) (Attached or Not Attached)
• VALID CHARACTER (As per NIT) (Attached or Not Attached)
• EXISTING COMMITMENT (As per NIT) (Attached or Not Attached)
• COST OF BOQ (As per TENDER) (Attached or Not Attached)
• BID PROCESSING FEE (As per TENDER) (Attached or Not Attached)
CIVIL
PERCENTAGE
L1
1
2 documents required · 2 mandatory
₹5,000
Processing Fee: 1180
₹49,500
Office Nagar Parishad, Naugachia
5 Jul 2026
5 Jul 2026
14 Jul 2026
5 Jul 2026
13 Jul 2026
5 Jul 2026
9 Jul 2026
NAGAR PARISHAD NAUGACHIA, BHAGALPUR (BIHAR)
Bill of Quantity for Construction of RCC Drain with Cover from House of Binod Yadav to Banarsi Yadav House AND Construction of RCC Drain with Cover & PCC Road from House of Banarsi Yadav to Subodh Yadav House in Ward No -- 13
Estimated cost:- Rs. 2,474,037
Earnest money:- Rs. 49,500.00
Time of Completion:- 03 Months
Cost of BOQ:- Rs. 5,000.00
S.NO.A8:F22 ITEM OF WORKS UNIT QTY. RATE (in fig.) Amount (Rs)
1. BCD/ 15.2.1 Demolishing cement concrete including disposal of material within 50 metre lead: 1:3:6 or richer mix M³ 15.084 970.9 Rs. 14,645
2. BCD/ 15.24 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material within 50 metres lead. M³ 15.576 535.6 Rs. 8,343
3. BCD 2.8 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All Kinds of soil M³ 128.72 360.70 Rs. 46,428
4. BCD 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. M³ 82.26 287.30 Rs. 23,632
5. BCD 11.72 Providing designation 100 A one brick on flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, M² 289.50 283.30 Rs. 82,015
6. BCD/ 4.1.2 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work upto plinth level. 1:1.5:3(1 Cement :1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) M³ 30.18 4420.80 Rs. 133,413
7. BCD/ 5.2.2 Reinforced cement concrete work in wall (any thickness), including attached pilasters, buttresses ,plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upt floor five level excluding cost of centring, shuttering, finishin and reinforcement. 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) M³ 96.48 5670.00 Rs. 547,045
8. BCD 5.22. Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo Mechanically Treated bars TMTC-500-10mm dia.
8.(i) BCD 5.22.7B Thermo Mechanically Treated bars TMTC-500-10 mm dia. KG 4824.03 92.60 Rs. 446,705
8.(ii) BCD/ 5.22.7C Thermo Mechanically Treated bars TMTC-500-12 mm dia. KG 4824.03 90.80 Rs. 438,022
9. BCD 4.3.1 Centring and shuttering including strutting,propping etc. and removal or form work for Foundations,footings, bases Columns M² 1033.44 211.10 Rs. 218,160
10. RCD 3.11 Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.) M³ 115.85 122.09 Rs. 14,144
11 Carriage of Materials
(i) Coarse sand- 65 KM(P)+ 1KM(K) M³ 54.46 1586.55 Rs. 86,408
(ii) Stone Chips-95 KM(P) + 1KM (US) M³ 107.66 2194.23 Rs. 236,231
(iii) Bricks-7KM (P)+ 1KM(K) %/Nos. 7030.59 940.97 Rs. 6,616
(iv) Local Sand-2KM (P)+1KM (K) M³ 86.60 310.42 Rs. 26,882
12 Difference cost of Material with G.S.T.
(ii) Bricks %/Nos. 7030.59 365.61 Rs. 2,570
13 Recovery of Servicable bricks Less (-) 30 % %/Nos. -2308.36 6081.05 Rs. -14,037
14 Add seignorate fee
(i) Coarse sand M³ 54.46 17.58 Rs. 957
(ii) Stone Chips M³ 107.66 59.54 Rs. 6,410
(iii) Bricks %/Nos. 7030.59 512.80 Rs. 3,605
(iv) Local Sand M³ 86.60 14.19 Rs. 1,228
Total Rs. 2,342,174
15. L.S. Add for sign.board,scheme name plate,Quality test & Colour photo graph (Payment after providing actual voucher) Set 1 6000.00 Rs. 6,000
Total Rs. 2,348,174
16 18 % GST IN PLACE OF 12 % GST (MULTIPLYING FACTOR = 1.0536) Rs. 2,474,037
G.Total Rs. 2,474,037
Executive Officer
Nagar Parishad Naugachia
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 03.pdf
NIT • 4.73 MB
Corrigendum 01.pdf
NIT • 0.31 MB
Corrigendum 02.pdf
NIT • 0.43 MB
B.O.Q Final_Gr-31.(W-13).xlsx
NIT • 0.01 MB