Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.3 LAdmitted-Finance SUBHASINI TEA ESTATE HASIMARA PS JAIGOAN DIST ALIPURDUAR WB PIN 735215 | ALIPURDUAR | WEST BENGAL | 735215 | L1 | Admitted-Finance | |
| 2 | L2₹45.4 L+₹2.0 L (4.69%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹45.6 L+₹2.3 L (5.34%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹46.1 L+₹2.8 L (6.37%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹46.1 L+₹2.8 L (6.49%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S P K AGARWALA L3 | M/S I P GROUP L4 | M/S ANIL KUMAR BAUL L2 | M/S ASHOK ENTERPRISE L5 | M/S SANMILAN NANDI L6 | M/S. VINITA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of un-reinforced cement concrete of any description and in any position not otherwise specifically provided for and disposal of unserviceable materials/debris and rubbish to a distance n. exc. 100m, complete all as specified and directed. | 1.5 | Cum | 780 ₹1,170 Lowest | 807 ₹1,210.5 | 816 ₹1,224 | 824 ₹1,236 | 780 ₹1,170 Lowest | 790 ₹1,185 |
| 2.00 | Cleaning the surfaces of brick/rcc using wire brush , brooming down and washing down with water to remove dust etc. and brushing with neat cement slurry @0.5 kg/sqm with acrylic based polymer modified cementitous composite (Pidifine 2K) @ 0.50 kg/sqm, complete all as specified and directed. | 12 | Sqm | 155 ₹1,860 | 165 ₹1,980 | 175 ₹2,100 | 180 ₹2,160 | 190 ₹2,280 | 150 ₹1,800 Lowest |
| 3.00 | Supply only liquid water proofing compound conforming to IS: 2645 - 1975 specification, complete all as directed. | 9.8 | Ltr | 196 ₹1,920.8 | 211 ₹2,067.8 | 226 ₹2,214.8 | 232 ₹2,273.6 | 247 ₹2,420.6 | 190 ₹1,862 Lowest |
| 4.00 | M&L 10mm thick rendering on fair faces of brick work or concrete surfaces in CM (1:3), using water proofing compound @ 3% by weight of cement, in sunken portion, complete all as specified and directed. | 12 | Sqm | 225 ₹2,700 | 215 ₹2,580 Lowest | 231 ₹2,772 | 236 ₹2,832 | 239 ₹2,868 | 220 ₹2,640 |
| 5.00 | M&L for PCC (1:5:10) type E-2, (using 40mm graded crushed stone aggregate) as in sunken portion, complete all as specified and directed. | 1.5 | Cum | 5,415 ₹8,122.5 | 5,435 ₹8,152.5 | 5,455 ₹8,182.5 | 5,470 ₹8,205 | 5,490 ₹8,235 | 5,400 ₹8,100 Lowest |
| 6.00 | M&L for 25mm thick PCC (1:2:4) type B- 0, (using 12.5mm graded crushed stone aggregate) as in sunken portion, complete all as specified and directed. | 12 | Sqm | 244 ₹2,928 | 252 ₹3,024 | 260 ₹3,120 | 264 ₹3,168 | 272 ₹3,264 | 240 ₹2,880 Lowest |
| 7.00 | Taking down cement plaster of any description any thickness incl racking out joints hacking for keys scrubbing down with water etc, including disposal of debris and rubbish to a distance not exceeding 100m, complete all as specified and directed. | 620 | Sqm | 78 ₹48,360 | 86 ₹53,320 | 94 ₹58,280 | 70 ₹43,400 Lowest | 105 ₹65,100 | 75 ₹46,500 |
| 8.00 | M&L for rendering 15mm thick on fair faces of brick work or concrete surfaces in CM (1:6) and finished even and smooth without using extra cement, complete all as specified and directed. | 60 | Sqm | 287 ₹17,220 | 291 ₹17,460 | 295 ₹17,700 | 302 ₹18,120 | 306 ₹18,360 | 280 ₹16,800 Lowest |
| 9.00 | M & L for rendering 15mm thick in two coats (10mm under layer + 5mm top layer) on fair faces of brick work or concrete surfaces of wall in CM (1:4), mixed with water proofing compound on top layer as per manufacturer's instructions and finished the surface even and fair without using extra cement, complete all as specified and directed.
(Note : WPC shall be measured and paid separately) | 540 | Sqm | 369 ₹1,99,260 | 374 ₹2,01,960 | 355 ₹1,91,700 Lowest | 388 ₹2,09,520 | 393 ₹2,12,220 | 360 ₹1,94,400 |
| 10.00 | M&L for rendering 5mm thick in CM (1:3) on fair faces ceiling surfaces, rendering finished even and smooth (without using extra cement), complete all as specified and directed. | 20 | Sqm | 204 ₹4,080 | 207 ₹4,140 | 210 ₹4,200 | 214 ₹4,280 | 195 ₹3,900 Lowest | 200 ₹4,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
1 Sept 2026, 6:00 pmClosed
GE (AF) HASIMARA
GE (AF) HASIMARA PO-HASIMARA DIST-ALIPURDUAR PIN-735215
REPAIR TO TILING, PLUMBING, PLASTERING SUNKEN FLOOR, REPAIR TO JOINERY, FALSE CEILING, CUPBOARD AND ALLIED WORK IN MD/OTM IN DOMESTIC AREA, COMPREHENSIVE MAINT OF HIGH RISE BLDG INCLUDING HANGER DOOR REPAIR IN TECH AREA AND REPAIR/MAINT OF EXTERNAL S
2026_MES_782563_1
C/8990/2026-27/E8
Open Tender
Civil Works
Item Rate
300 days
GE (AF) HASIMARA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) HASIMARA
₹80,000
Yes
23 Sept 2026
4 Aug 2026
8 Sept 2026
4 Aug 2026
1 Sept 2026
18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of un-reinforced cement concrete of any description and in any position not otherwise specifically provided for and disposal of unserviceable materials/debris and rubbish to a distance n. exc. 100m, complete all as specified and directed. | 1.5 | Cum | - | - |
| 2 | Cleaning the surfaces of brick/rcc using wire brush , brooming down and washing down with water to remove dust etc. and brushing with neat cement slurry @0.5 kg/sqm with acrylic based polymer modified cementitous composite (Pidifine 2K) @ 0.50 kg/sqm, complete all as specified and directed. | 12 | Sqm | - | - |
| 3 | Supply only liquid water proofing compound conforming to IS: 2645 - 1975 specification, complete all as directed. | - | Ltr | - | - |
| 4 | M&L 10mm thick rendering on fair faces of brick work or concrete surfaces in CM (1:3), using water proofing compound @ 3% by weight of cement, in sunken portion, complete all as specified and directed. | 12 | Sqm | - | - |
| 5 | M&L for PCC (1:5:10) type E-2, (using 40mm graded crushed stone aggregate) as in sunken portion, complete all as specified and directed. | 1.5 | Cum | - | - |
| 6 | M&L for 25mm thick PCC (1:2:4) type B- 0, (using 12.5mm graded crushed stone aggregate) as in sunken portion, complete all as specified and directed. | 12 | Sqm | - | - |
| 7 | Taking down cement plaster of any description any thickness incl racking out joints hacking for keys scrubbing down with water etc, including disposal of debris and rubbish to a distance not exceeding 100m, complete all as specified and directed. | - | Sqm | - | - |
| 8 | M&L for rendering 15mm thick on fair faces of brick work or concrete surfaces in CM (1:6) and finished even and smooth without using extra cement, complete all as specified and directed. | 60 | Sqm | - | - |
| 9 | M & L for rendering 15mm thick in two coats (10mm under layer + 5mm top layer) on fair faces of brick work or concrete surfaces of wall in CM (1:4), mixed with water proofing compound on top layer as per manufacturer's instructions and finished the surface even and fair without using extra cement, complete all as specified and directed.
(Note : WPC shall be measured and paid separately) | 540 | Sqm | - | - |
| 10 | M&L for rendering 5mm thick in CM (1:3) on fair faces ceiling surfaces, rendering finished even and smooth (without using extra cement), complete all as specified and directed. | 20 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_876750.xls
BOQ • 0.48 MB
Tender8990.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .