| 1.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 8.08 | m3 | 263.7 ₹2,130.7 Lowest | 265 ₹2,141.2 |
| 2.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 9.26 | m3 | 5,504.2 ₹50,968.89 Lowest | 5,510 ₹51,022.6 |
| 3.00 | Refilling with excavated earth as per standard specifications etc complete | 2.02 | m3 | 45.8 ₹92.75 Lowest | 48 ₹97.2 |
| 4.00 | Random rubble masonry in Cement mortar 1 : 5 mix using new rough stones with symultaneous pointing including cost and conveyance of all materials to site and labour charges etc complete. | 7.67 | m3 | 5,887.7 ₹45,158.66 Lowest | 5,890 ₹45,176.3 |
| 5.00 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 6.93 | m3 | 6,121.5 ₹42,422 Lowest | 6,125 ₹42,446.25 |
| 6.00 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations g | 7.64 | m2 | 1,095 ₹8,365.8 Lowest | 1,100 ₹8,404 |
| 7.00 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 2.42 | m3 | 9,115.1 ₹22,058.54 Lowest | 9,200 ₹22,264 |
| 8.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS ro | 360 | Kg | 91.85 ₹33,066 Lowest | 95 ₹34,200 |
| 9.00 | Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete. | 34.97 | m2 | 284 ₹9,931.48 Lowest | 286 ₹10,001.42 |
| 10.00 | Painting two coats with Plastic Emulsion Paint over new plastered including cost and conveyance of all materials to site and all labour charges etc comoplete | 53.57 | m2 | 262.4 ₹14,056.77 Lowest | 270 ₹14,463.9 |
Tender Value
₹5.3 L
EMD Value
₹5,300
Closing Date
23 Feb 2026, 3:00 pmClosed
Block Development Officer (B.Pt)
Block Development Office Nanguneri
Construction of GLR Cover with Cooling sheet and New Borewell with Motor Near Dhalapathisamuthiram Kelur Multipurpose Hall at Dhalapathisamuthiram Panchayat.
2026_RDTN_661915_1
A3/607/2025
Open Tender
Construction Works
Fixed Rate Contract
80 days
Block Development Officer (B.Pt)
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,300
24 Jul 2026
20 Feb 2026
23 Feb 2026
20 Feb 2026
23 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 8.08 | m3 | - | - |
| 2 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 9.26 | m3 | - | - |
| 3 | Refilling with excavated earth as per standard specifications etc complete | 2.03 | m3 | - | - |
| 4 | Random rubble masonry in Cement mortar 1 : 5 mix using new rough stones with symultaneous pointing including cost and conveyance of all materials to site and labour charges etc complete. | 7.67 | m3 | - | - |
| 5 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 6.93 | m3 | - | - |
| 6 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations g | 7.64 | m2 | - | - |
| 7 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 2.42 | m3 | - | - |
| 8 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS ro | 360 | Kg | - | - |
| 9 | Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete. | 34.97 | m2 | - | - |
| 10 | Painting two coats with Plastic Emulsion Paint over new plastered including cost and conveyance of all materials to site and all labour charges etc comoplete | 53.57 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_794527.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].