Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹4.5 L+₹18,469.36 (4.24%)Accepted-Finance | 2 | Accepted-Finance L-2 | |
| 3 | 3₹4.8 L+₹46,657.20 (10.7%)Accepted-Finance | 3 | Accepted-Finance L-3 |
| Sl No | Description | Qty | Unit | M/s Patel Enterprises L2 | JAI BHART ENGG WORKS L1 | MANAS ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00Following works are to be carried out for Capacity upgradation of 02 No. Bays from Single ACSR Panther to Single ACSR Moose at 220 KV S/S Sarojininagar Lucknow. | ||||||
| 2.00 | Replacement of runthrough from old panther conductor to new Moose conductor from A- Bus Isolator to 132 KV Circuit breaker.
(One Job per phase) | 6 | Job | 950 ₹5,700 | 880 ₹5,280 Lowest | 910 ₹5,460 |
| 3.00 | Replacement of runthrough from old panther conductor to new Moose conductor from Line Isolator to 132 KV CT.
(One Job per phase) | 6 | Job | 1,490 ₹8,940 | 1,470 ₹8,820 Lowest | 1,525 ₹9,150 |
| 4.00 | Dismantling of 132 KV Jack Bus between CB & Line Isolator of panther conductor alogwith disc insulator, tension/gun fitting and safely lowering down the conductor from both side at height of 7 mtr approx. This work also includes stacking of old dismantled conductor, fittings and clamps to store.
(One Job per phase) | 6 | Job | 3,500 ₹21,000 | 3,130 ₹18,780 Lowest | 3,350 ₹20,100 |
| 5.00 | Stringing of new 132KV Jack bus between CB & Line Isolator of Moose conductor alongwith disc insulator, tension/ gun fitting at height of 7 mtr approx.This work also includes connection of jack bus to Line isolator and Circuit breaker by Y-type dropper and shifting of new conductor and fitting from store to site.
(One Job per phase) | 6 | Job | 5,350 ₹32,100 | 5,290 ₹31,740 Lowest | 5,500 ₹33,000 |
| 6.00 | Disconnection of twin moose Main Bus from two sides to isolate to bus section in TRT Bay by opening of PG Clamp/ cutting of conductor. | 24 | Job | 825 ₹19,800 | 785 ₹18,840 Lowest | 810 ₹19,440 |
| 7.00 | Reconnection of twin moose Main bus from two sides by PG clamp after completion of work. (One Job per phase) | 24 | Job | 1,850 ₹44,400 | 1,765 ₹42,360 Lowest | 1,820 ₹43,680 |
| 8.00 | Disconnection of old existing interconnecting jumpers one side from A-Bus/B- Bus/Transfer Bus at the height of 8 mtrs approx and other side from isolator at height of 5.5 mtr approx by opeing/cutting of clamp and conductor.and other side from isolator at height of 5.5 mtr approx by opeing/cutting of clamp and conductor.
(One Job per dropper) | 18 | Job | 630 ₹11,340 | 585 ₹10,530 Lowest | 650 ₹11,700 |
| 9.00 | Connection of new (moose conductor) interconnecting jumpers one side from A-Bus/B- Bus/Transfer Bus at the height of 8 mtrs approx and other side from isolator at height of 5.5 mtr approx with clamp and conductor. (One Job per phase) | 18 | Job | 930 ₹16,740 | 880 ₹15,840 Lowest | 911 ₹16,398 |
| 10.00 | Dismantling of 132 KV Tandem isolators HBB/TMG/HLM make post insulator after opening of nut-bolt, opening of jumpers, disconnection of control cable and shifting of dismantlled isolator to store as per instruction of Engineer-In-Charge. | 4 | Job | 7,200 ₹28,800 | 6,860 ₹27,440 Lowest | 6,950 ₹27,800 |
Tender Value
₹4.4 L
EMD Value
₹4,500
Closing Date
22 Apr 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
Works
2025_UPTCL_1023972_1
E-Tender No. ETC-II/L/71/2024-25
Open Tender
Electrical Works
Item Rate
60 days
Electy. 400 KV S/S Sarojini Nagar, LKO
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹4,500
20 Aug 2025
1 Apr 2025
23 Apr 2025
1 Apr 2025
22 Apr 2025
1 Apr 2025
Amount
Following works are to be carried out for Capacity upgradation of 02 No. Bays from Single ACSR Panther to Single ACSR Moose at 220 KV S/S Sarojininagar Lucknow.
Replacement of runthrough from old panther conductor to new Moose conductor from A- Bus Isolator to 132 KV Circuit breaker. (One Job per phase)
Replacement of runthrough from old panther conductor to new Moose conductor from Line Isolator to 132 KV CT. (One Job per phase)
Dismantling of 132 KV Jack Bus between CB & Line Isolator of panther conductor alogwith disc insulator, tension/gun fitting and safely lowering down the conductor from both side at height of 7 mtr approx. This work also includes stacking of old dismantled conductor, fittings and clamps to store. (One Job per phase)
Stringing of new 132KV Jack bus between CB & Line Isolator of Moose conductor alongwith disc insulator, tension/ gun fitting at height of 7 mtr approx.This work also includes connection of jack bus to Line isolator and Circuit breaker by Y-type dropper and shifting of new conductor and fitting from store to site. (One Job per phase)
Disconnection of twin moose Main Bus from two sides to isolate to bus section in TRT Bay by opening of PG Clamp/ cutting of conductor.
Reconnection of twin moose Main bus from two sides by PG clamp after completion of work. (One Job per phase)
Disconnection of old existing interconnecting jumpers one side from A-Bus/B- Bus/Transfer Bus at the height of 8 mtrs approx and other side from isolator at height of 5.5 mtr approx by opeing/cutting of clamp and conductor.and other side from isolator at height of 5.5 mtr approx by opeing/cutting of clamp and conductor. (One Job per dropper)
Connection of new (moose conductor) interconnecting jumpers one side from A-Bus/B- Bus/Transfer Bus at the height of 8 mtrs approx and other side from isolator at height of 5.5 mtr approx with clamp and conductor. (One Job per phase)
Dismantling of 132 KV Tandem isolators HBB/TMG/HLM make post insulator after opening of nut-bolt, opening of jumpers, disconnection of control cable and shifting of dismantlled isolator to store as per instruction of Engineer-In-Charge.
Erection of 132 KV tandem isolators of different make as per instruction manual and technical specification with post insulator, operating mechanism box, tie rod, arms and proper alignment for smooth operation. This work also included shifting of new isolator from store to site, termination of control cable, jumper connection, earthing(Painted with green color) and all associated work for complete the job as per instruction of Engineer-In-Charge.
Dismantling of 145 KV Old PIs after opening of nut-bolt, opening of jumpers and shifting of dismantlled PI to store as per instruction of Engineer-In-Charge.
Erection of 145 KV New PI including shifting of new PI from store to site, jumper connection and all associated work for complete the job as per instruction of Engineer-In-Charge.
Dismantling of 132 KV CT after opening of nut-bolt, opening of jumpers, disconnection of control cable and shifting of dismantlled CT to store as per instruction of Engineer-In-Charge.
Erection of 132 KV 800-400-200/1A CT as per instruction manual and technical specification. This work also included shifting of new CT from store to site, termination of control cable, jumper connection, earthing (Painted with green color) and all associated work for complete the job as per instruction of Engineer-In-Charge.
Replacement of 132 KV CT Junction Box after dismantlling of Old Junction Box by disconnetion of Control Cable and fixing of new junction box including termination and ferruling of Control Cable with neat finish. This work also included earthing of Junction Box by welding and cutting work.
Replacement of 132 KV PT Junction Box after dismantlling of Old Junction Box by disconnetion of Control Cable and fixing of new junction box including termination and ferruling of Control Cable with neat finish. This work also included earthing of Junction Box by welding and cutting work.
Dismantling of 120 KV LA by opening of jumpers, disconnecting earthing flats, surge counter, opening of base nut-bolt etc for completion of work. Shifting of old LA to store as per direction of Engineer- In- Charge
Erection of new 120 KV LA as per instruction manual of various equipments and technical specification including shifting of new LA from store to site, fixing of surge counter, jumper connection, earthing(Painted with green color) and associated work to complete the work.
Dismantling of Old Protection Panel installed in control room by opening of cable connections, earthing flats, nuts bolts etc including safe disconnection from Control Panel and recording of connection. The work also includes identification of the control cables by proiding suitable ferrules etc and safe shifting of the panel fem Control Room to Store as per direction of Engineer-In-Charge.
Erection of New Protection Panel after shifting of Panel from Store to Control Room. Followed by connection of existing Control Cable as per cable schedule including making holes in base plates, Glanding and termination and ferruling alongwith preparation of Inter Connection drawing and commisioning of the panels including providing of interconnection drawing.
M/s Patel Enterprises (BID ID -5137707)
MANAS ELECTRICALS (BID ID -5137671)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .