Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.8 LAdmitted-Finance | -22.75% | ₹14.8 L | L1 | Admitted-Finance |
| 2 | L2₹15.6 L+₹78,943.93 (5.35%)Admitted-Finance BARMER | RAJASTHAN | 344001 | -18.62% | ₹15.6 L+₹78,943.93 (5.35%) | L2 | Admitted-Finance |
| 3 | L3₹15.7 L+₹96,529.50 (6.54%)Admitted-Finance | -17.70% | ₹15.7 L+₹96,529.50 (6.54%) | L3 | Admitted-Finance |
| 4 | L4₹16.1 L+₹1.4 L (9.31%)Admitted-Finance | -15.56% | ₹16.1 L+₹1.4 L (9.31%) | L4 | Admitted-Finance |
| 5 | L5₹16.6 L+₹1.9 L (12.6%)Admitted-Finance | -13.00% | ₹16.6 L+₹1.9 L (12.6%) | L5 | Admitted-Finance |
Tender Value
₹19.1 L
EMD Value
₹38,240
Closing Date
20 Jul 2026, 6:00 pmClosed
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
Municipal Council Banswara Construction of Drainge at Shyampura kagdi shamshan ke pass
2026_DLB_574582_1
MUNICIPAL COUNCIL BANSWARA 08/2026-27/03
Open Tender
Civil Works
Percentage
60 days
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
Municipal Council Banswara Construction of Drainge at Shyampura kagdi shamshan ke pass
2 documents required · 2 mandatory
₹500
COMMISSIONER MUNICIPAL COUNCIL BANSWARAc
₹38,240
Yes
7 Aug 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. | 517.5 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 34.5 | Cum | - | - |
| 3 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 945 | Sqm | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 23.1.1 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size). (As per design mix) | 114.75 | Cum | - | - |
| 5 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. 23.19.1 Mild steel and Medium Tensile steel bars. | 8,262 | Kg. | 0.9 | ₹7,435.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_1021993.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .