| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC | ₹18.1 L | L1 | Accepted-AOC Found lowest one bidder |
| 2 | L2₹34.6 L+₹16.4 L (90.7%)Rejected-AOC | ₹34.6 L+₹16.4 L (90.7%) | L2 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹19.3 L
Closing Date
12 Oct 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of additional class room at govt. Pry school Zamchung
2022_RDD_7900_4
NIT 37 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
21 Feb 2023
1 Oct 2022
14 Oct 2022
1 Oct 2022
12 Oct 2022
1 Oct 2022
Amount
Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil
Providing and laying dry stone soling in foundation bed, wall bed, flooring including cost of stone.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in1:3:6 (1 cement: 3 fine sand : 6 gradedstone aggregate 20mm nominal size)Crushed
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and Reinforcemen t1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement of R.c.c work in plinth band incl. straightening, cutting, bending, placing in position and binding all complete.
Centring and shuttering including strutting propping etc and removal of form work for.-Foundations: footings, bases of columns etc. for mass concrete.
Centring and shuttering including strutting propping etc and removal of form work for.- olumns, Pillars, Piers, Abutments, Pos ts and Struts
Centring and shuttering including strutting propping etc and removal of form work for.- Lintels, beams, plinth beams, girders, bressumers and centilevr.
Centring and shuttering including strutting propping etc and removal of form work for.- spended floors, roofs, landings, balco nies and access platform.
Centring and shuttering including strutting propping etc and removal of form work for.- Edges of slabs and breaks in floors and walls. Under 20cm wide.
Random Rubble masonry with Hard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Providing and laying damp-proof course 50rnm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size crushed.
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows including lSI marked M.S. pressed Butt hinges bright finished of required size with necessary screws excluding panelling which will be paid for separately,al! complete as per direction of engineer- in charge. Second kail wood
Providing and fixing glazed shutters for doors, windows-and clerestory windows using 1 Okg/sqm (4mm thick) float Rate for thickness of glass panes including lSI marked M.S. pressed butt· shutters in mm per sqm hinges bright finished of required size with necessary screws.Second class kail wood
15mm Cement plaster on the rough side of single or half brick wall of mix: ( 1 cement : 4 coarse sand) .
6mm cement plaster to ceiling of mix 1 : 3 (1 cement: 3 fine sand)
Providing and applying white cement based putty of average thickness 2 mm, of approved brand and manufacture, over the plastered wall surface to prepare the surface even and smooth complete.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and in -eluding priming coat with cement primer
French spirit polishing with Two or more coats on new works including a coat of wood filler
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 50 mmthick with 20mm nominal size stone aggregate. (a) Crushed.
Providing and laying of readymade flooring 8mm thick (ACTION TESA AC4) complete job.
Carriage of Stone avg. Lead of 15 Km by MT
Carriage of sand and coarse agg. avg. Lead of 15 Km by MT
Carriage of cement and Steel avg. Lead of 20 Km by MT
M/S MANZOOR HUSSAIN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .