| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.6 CrAccepted-AOC VILL PANOH PO CHOURI TEHSIL SUJANPUR DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹3.6 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.9 Cr+₹25.7 L (7.16%)Rejected-Finance CT PUBLIC SCHOOL PHAYAL KHASARA NO 597 JAKHOO MOHAL PHAIL SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 170009 | ₹3.9 Cr+₹25.7 L (7.16%) | L-2 | Rejected-Finance Not Found L-1 |
| 3 | L-3₹4.2 Cr+₹58.1 L (16.1%)Rejected-Finance | ₹4.2 Cr+₹58.1 L (16.1%) | L-3 | Rejected-Finance Not Found L-1 |
| 4 | L-4₹4.2 Cr+₹59.8 L (16.6%)Rejected-Finance | ₹4.2 Cr+₹59.8 L (16.6%) | L-4 | Rejected-Finance Not Found L-1 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-as per eligibility |
Tender Value
₹4.3 Cr
EMD Value
₹4.6 L
Closing Date
26 Nov 2021, 11:00 amClosed
Executive Engineer Jal Shakti Divn No.1 Una HP
Executive Engineer Jal Shakti Divn No.1 Una HP
Providing Storm Water drainage to Una Town under State Disaster Mitigation Fund. ( SH Construction of Kotla main Drain) Job-1.
2021_HPIPH_53545_1
No. JSV-I -TA-E-tender /2021- 10965-94 dt 12-11-21
Open Tender
Civil Works
Item Rate
180 days
Kotla main Drain
as per NIT
8 documents required · 8 mandatory
₹2,500
Yes
Executive Engineer Jal Shakti Divn No.1 Una HP
₹4.6 L
Chief Engineer (Hamirpur Zone) Ja
21 Mar 2022
13 Nov 2021
26 Nov 2021
13 Nov 2021
26 Nov 2021
13 Nov 2021
13 Nov 2021 - 26 Nov 2021
22 Nov 2021
Amount
Main Drain
Excavation in foundation, trenches in earth work in all kinds of soil,such as pick work,jumper work.blasting work in hard rock and soft rock and in saturated soil etc. i/c all leads and lifts , stacking the excavated soil not more than 3 mtrs. clear form the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as per the direction of the Engineer-in-Charge.
Providing & laying cement concrete (M-10)1:3:6 (1cement :3 sand: 6 crushed stone aggregate 20 mm nominal size ) and curing complete excluding cost of form work in foundation and plinth including carraige of material within all leads and lifts as per the direction of the Engineer-in-Charge.
Providing and laying cement concrete M-30 not less than 1:1.5:3 (1cement:1.5 Sand :3 graded stone aggregate ) as per IS 3370 Part-1, 2009 and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in foundation and plinth including carraige of material within all leads and lifts as per the direction of the Engineer-in-Charge.
Providing Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete in all respect in all leads and lifts & as per direction of the Engineer-in-Charge
Providing form work with steel plate 3.15 mm thick welded with angle iron in frame 30x30x5mm so as give a fair finish including centring, shuttering, strutting and propping etc with wooden battens and ballies, height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in site-reinforced concrete and plain concrete work in
Vertical surfaces such as walls (any thickness) partitions and the like i/c attached pillasres buttresses, plinth & string courses and the like including all leads and lifts complete in all respect.
Demolition below G.L. upto all depth and disposal of unserviceable materials un-reinforced cement concrete more than 15 cm. Thickness complete within all leads and lifts as per the direction of the Engineer-in-charge.
Providing and fixing of PVC pipe 75mm dia for weep holes in vertical wall including carriage of materials in all leads and lifts.
Culverts.
Excavation in foundation, trenches in earth work in all kinds of soil,such as pick work,jumper work.blasting work in hard rock and soft rock and in saturated soil etc. i/c all leads and lifts , stacking the excavated soil not more than 3 mtrs. clear form the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as per the direction of the Engineer-in-Charge.
Providing & laying cement concrete (M-10)1:3:6 (1cement :3 sand: 6 crushed stone aggregate 20 mm nominal size ) and curing complete excluding cost of form work in foundation and plinth including carraige of material within all leads and lifts as per the direction of the Engineer-in-Charge.
Providing and laying cement concrete M-30 not less than 1:1.5:3 (1cement:1.5 Sand :3 graded stone aggregate ) as per IS 3370 Part-1, 2009 and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in foundation and plinth including carraige of material within all leads and lifts as per the direction of the Engineer-in-Charge.
Providing Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete in all respect in all leads and lifts & as per direction of the Engineer-in-Charge
Providing form work with steel plate 3.15 mm thick welded with angle iron in frame 30x30x5mm so as give a fair finish including centring, shuttering, strutting and propping etc with wooden battens and ballies, height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in site-reinforced concrete and plain concrete work in:
Flat surfaces such as soffits of suspended floors,roofs,landing and the like floor etc. up to 20 cm in thickness including all leads and lifts complete in all respect.
Vertical surfaces such as walls (any thickness) partitions and the like i/c attached pillasres buttresses, plinth & string courses and the like including all leads and lifts complete in all respect.
Providing and fixing of steel railing with balusters (vertical pipes) including jointing the pipe at landing or at curve, properly grinding all the joints and buffing the complete railing for smooth finish along road for protection wok including carriage of materials in all leads and lifts.
Thakur Constructions
Super Industrial Corporation
Deepak Kumar Beetan
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .