Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC KOHRAR PO YOGICHARA DISTRICT SONBHADRA U P | SONBHADRA | SONBHADRA | UTTAR PRADESH | L1 | Accepted-AOC As per TC recommendation and approval | |
| 2 | L2₹9.2 L+₹1.0 L (12.3%)Rejected-Finance SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | L2 | Rejected-Finance As per NIT |
Tender Value
₹10.4 L
EMD Value
₹13,100
Closing Date
12 Apr 2024, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
M K Pandey, Staff officer (Excavation)
O/o Staff officer (Excavation), Bina Project, NCL, District Sonebhadra (UP), Pincode 231220
Replacement of Lower and Upper Rail Segment (total 48 nos.) and Live Ring Assembly (120 nos. Swing Rollers or 20 Roller Sectors) of 24/96 Gaurav Dragline of Bina Project.
2024_NCL_305914_1
Bina/SO(Excv)/Tender/23-24/116 dt 27.03.2024
Open Tender
Excavation Department Work
Item Rate
30 days
Bina Project, NCL.
As per NIT
5 documents required · 5 mandatory
₹13,100
30 Jul 2024
27 Mar 2024
13 Apr 2024
28 Mar 2024
12 Apr 2024
28 Mar 2024
28 Mar 2024 - 4 Apr 2024
Amount
Charges including contractors profit (Labour consists of 1 no. Supervisor and 12 nos. unskilled for a period of 14 shift-days (2 shifts X 7 days) for Complete cleaning of rail segments, rail track and its adjoining area including base area between rack segments and rail path assembly. Complete removing of cardium, grease, soil and other oil from nearby area of rail segments and live ring assembly .
Charges including contractors profit (Labour consists of 1 no. Supervisor, 4 nos. skilled fitter, 3 nos. skilled welder, 1 no. Grinderman and 12 nos. semi-skilled helper for a period of 14 shift-days (2 shifts X 7 days) for Removal of old/damaged lower & upper rail segments (48 nos) and live ring Assembly (20 sector) by proper support.
Charges including contractors profit (Labour consists of 1 no. Supervisor, 4 nos. skilled fitter, 3 nos. skilled welder, 1 no. Grinderman and 12 nos. semi-skilled helper for a period of 32 shift-days (2 shifts X 16 days) for Fitting and alignment of Lower & Upper Rail segments (48 Nos) and Live Ring Assembly (20 Nos) by proper support.
Hiring Charges: Welding Machine & Accessories-3 No @ (Rs. 105/Day), Welding and cutting set -3 set @ (Rs. 21/Day), Grinder-01 No. @ (Rs. 60/ Day), Hyd. Jack. 200T-02 Nos @ (Rs. 250/Day) and Hand Lamp - 4 nos. @ (Rs. 20/Day).
Transportation charges for shifting of manpower & tools.
Total impact of GST for the purpose of CTC
Kohli Engineering Company
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_316996.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .