| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance | ₹1.4 Cr | L1 | Accepted-Finance Being a lowest |
| 2 | L2₹1.4 Cr+₹4.6 L (3.37%)Rejected-Finance | ₹1.4 Cr+₹4.6 L (3.37%) | L2 | Rejected-Finance Being a 2nd lowest |
| 3 | L3₹1.4 Cr+₹5.3 L (3.81%)Rejected-Finance VIDYUT BHAWAN HPSEBL SHIMLA 171004 | SHIMLA | HIMACHAL PRADESH | 171004 | ₹1.4 Cr+₹5.3 L (3.81%) | L3 | Rejected-Finance Being a 3rd lowest |
Tender Value
₹78.8 L
EMD Value
₹1.1 L
Closing Date
19 Jul 2022, 5:00 pmClosed
Er. Vishal Chopra
EE HPPWD Division Killar Pangi
C/o M/able link road from Mindhal to Kulal road Km 0/0 to 6/500 Sub Head Formation cutting from Km 0/294 to 0/915 1/015 to 1/140 and 1/197 to 1/250 C/o B/Wall at RD 0/915 to 0/940 and C/o R/Wall at RD 1/010 to 0/015 1/054 to 1/087 1/097 to 1/116 and
2022_PWD_62604_1
PW/KD/GA/Tender/2022-3502-3601 Dated 02.07.2022
Open Tender
Civil Works - Roads
Item Rate
546 days
Killar
As refer to Bid Document
9 documents required · 9 mandatory
₹2,000
EE Killar
₹1.1 L
18 Aug 2022
11 Jul 2022
21 Jul 2022
11 Jul 2022
19 Jul 2022
11 Jul 2022
Amount
Excavation in hilly area in all heights and depths and in all kind of soil by mannual/mechanical means including saturated soil comprising of ordinary soil,soft rock,hard rock chiselling,wedging out of rock(where blasting is prohibited) and their intermediate classification of soild setting out true to the required lines grades width cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-Charge at site according to the MORD technical specification clause 302,1603 and 1603.2 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of road and transporation of unuseful material for filling in road wyas camber,embankments for grade improvements and disposal of all material to required width of the road or on approved dumping site through all modes of transporation including head load or animal transport or mechanical means alongwith its levelling fine dressing and carriage of machineries ,materials, tolls,equipments and safety measures and incidentials necessary to complete the work by mechanical means.and labour if required all Any loss to the public private property during the course of execution shall be the absolute respensibility of the contractor which shall have to be compensated by him in all cases.The rate including octroi royality Malkhana toll tax sale tax or other taxes imposed by the Govenment
Excavation in hilly areas in all heights and depths and in all kinds of soil by manual /mechanical means including saturated soil comprising of ordinary soil ,ordinary rock ,soft rock ,hard rock chiseling/wedging out rock(where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the lines, grades, width, cutting and trimming of side slopes and levels as shown on the drawings and as directed by Engineer-in-Charge at site, according to the MORD technical specification clause 302,1603.1 and 1603.2 and sorting out useful materials and stacking the same within in all leads and lifts in acquired road width and transportation of un-useful materials for filling in roadways camber ,embankments for grade improvements and disposal of all useful materials to acquired width of the road or on approved dumping sites through all modes of transportation including head load or animal transport or mechanical means alongwith its leveling fine dressing and carriage of machineries ,materials, tools ,equipments and safety measures. Any loss to the public/ private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases. The rates are inclusive of GST and other taxes tobe imposed by the Government.
Excavation in hilly area in all heights and depths and in all kind of soil by mannual/mechanical means including saturated soil comprising of ordinary soil,soft rock,hard rock chiselling,wedging out of rock(where blasting is prohibited) and their intermediate classification of soild setting out true to the required lines grades width cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-Charge at site according to the MORD technical specification clause 302,1603 and 1603.2 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of road and transporation of unuseful material for filling in road wyas camber,embankments for grade improvements and disposal of all material to required width of the road or on approved dumping site through all modes of transporation including head load or animal transport or mechanical means alongwith its levelling fine dressing and carriage of machineries ,materials, tolls,equipments and safety measures and incidentials necessary to complete the work by mechanical means.and labour if required all Any loss to the public private property during the course of execution shall be the absolute respensibility of the contractor which shall have to be compensated by him in all cases.The rate including octroi royality Malkhana toll tax sale tax or other taxes imposed by the Govenment
Earth work in excavation for structure and in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock, chiseling /wedging out rocks ( Where blasting is prohibited) for retaining walls, breast walls, culverts, drains and parapets etcetera as per drawings and M.O.R.D. technical specification clause 305.1 and as per direction of the Engineer- In – Charge, including setting out, construction of shoring and bracing , removal of stumps and other deleterious materials and disposal of materials upto any lead and upto lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty millimeters) compacted thickness including pumping and bailing out water (surface and sub soil water ) upto any depth and any quantum of water including cleaning of slush which may arrise out during dewatering. and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect. . Any loss to the public / private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases .
Providing and laying Mechanically mixed and vibrated concrete for plain / reinforced concretenominal mix 1:6:12( one cement is to six sand is to twelve graded crushed stone aggregate 20millimeter ( Twenty millimeter) nominal size in or under water and curing complete for 14( fourteen) days , in open foundations for all type of structures as in Retaining walls, Breast walls,Abutments,toe walls and the like in foundation of R/walls, B/walls etcetera including pumping or bailing out water ( surface and sub soil water) dewatering for all depths and any quantum of water including removal of slush which may arise at the time of laying under water complete for all heights / depths including the cost of form work complete as per drawings and M.O.R.D. technical specification Clauses 802,803,1202 and 1203 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect. The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government.
Providing and laying Mechanically mixed and vibrated concrete for plain / reinforced concretenominal mix 1:4:8( one cement is to four sand is to eight graded crushed stone aggregate 40 millimeter ( forty millimeter) nominal size in or under water and curing complete for 14( fourteen) days , in open foundations for all type of structures as in Retaining walls, Breast walls,Abutments,toe walls and the like in foundation of R/walls, B/walls etcetera including pumping or bailing out water ( surface and sub soil water) dewatering for all depths and any quantum of water including removal of slush which may arise at the time of laying under water complete for all heights / depths including the cost of form work complete as per drawings and M.O.R.D. technical specification Clauses 802,803,1202 and 1203 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect.
Random rubble masonry with hard stones of approved quality in sub structure in cement mortar 1:6 (one cement is to six sand) for structure like retaining walls, breast walls, wing walls, toe walls, abutment and similar works etcetera, in all heights/depths in or under water including pumping or bailing out water (surface and sub soil water) / dewatering, removal of slushies, which may arise at the time of masonry work under water complete including curing complete as per drawing and technical specification clause 702, 704,1202 and 1204 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect.
Random course rubble dry stone masonry with hard stone of approved quality in sub structure for structure like retaining walls, breast walls etcetra in all heights/depths as per MORD technical specification clause 702,704,1606.5 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect.
Back filling with granular material behind abutments, wing walls, return walls complete as per drawing and M.O.R.D. technical specification clause 1204.3.8 and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect.
Providing and laying P.C.C. M-20 copping on the top of the winw wall,return wall & Breast wall etc.complete as per drawing and techanical specification clause 612,710.1204,3.1(1:2:4)and as per directions of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation all leads, lifts and other incidental complete in all respect.
Than Dev
NARINDER KUMAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .