Tender Value
₹1.4 Cr
EMD Value
₹8.8 L
Closing Date
24 Sept 2026, 12:00 pm2d left
SE MBD CIRCLE PWD MORADABAD
SE MBD CIRCLE PWD MORADABAD
Year 2025-26 Under New Construction of Khetapur Road to Junior High School Dudhapur Link road
2026_CEMBD_1187209_4
5092/E-Nivida-MBD Circle/26-27 DT 25-08-2026
Open Tender
Civil Works - Roads
Percentage
365 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹8.8 L
Yes
SE MBD CIRCLE PWD MORADABAD
18 Sept 2026
18 Sept 2026
24 Sept 2026
18 Sept 2026
24 Sept 2026
18 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of subgrade and earthenshoulders with approved material obtained from road side with all lifts and leads trancporting to sites, spreading, grading to required slope and compected to meet requirement of table 300.2 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 10,000 | cum | 95 | ₹9,50,000 |
| 2 | Construction of subgrade and earthenshoulders with approved material obtained from borow pits with all lifts and leads trancporting 3 km up to sites, spreading, grading to required slope and compected to meet requirement of table No. 300-2 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 330 | cum | 110 | ₹36,300 |
| 3 | Construction of granular sub-base Grade-1 by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 653 | cum | 3,700 | ₹24,16,100 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 391 | cum | 4,450 | ₹17,39,950 |
| 5 | Construction of un-reinforced plain cement concrete pavement, 15 cm thickness as per design over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 Grade coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side frame work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the framework as per drawing), spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints by providing 12mm thick dura board at the specified spacing, applying debonding strips primer, sealant near approaches to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 but including cost of polythene sheet and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 783.75 | cum | 8,000 | ₹62,70,000 |
| 6 | Excavation in Cutting in Soil by manual means with lead upto 50 m / Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 325 | cum | 55 | ₹17,875 |
| 7 | providing concrete for plain/reinforced concrete P.C.C. Grade M-10 (1:3:6) in open foundations complete as per drawing and technical specifications. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 45 | cum | 7,100 | ₹3,19,500 |
| 8 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 (M-20) in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. Binding wire of supplied by the contractor free of cost including making of drip coarse. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 100 | cum | 7,600 | ₹7,60,000 |
| 9 | Mild steel or TMT Bars(Fe-500D grade or higher) or HYSD Bars or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 50 | Qtl | 6,800 | ₹3,40,000 |
| 10 | Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 as per direction of the Engineer-in-Charge including cost of all materials, labour T&P etc. required and including watering & ramming for proper completion of work. Chp 1 2c and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 15 | cum | 1,100 | ₹16,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.63 MB
Tendernotice_2.pdf
PDF • 6.40 MB
BOQ_2235123.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .