| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 Tendered Thiru C Palanisamy has quoted 0.11 less estimate rate and 0.34 less Current rate LOA issued to Thiru C Palanisamy L1 Tender |
| 2 | L2₹1.6 Cr+₹4.5 L (2.91%)Rejected-Finance | ₹1.6 Cr+₹4.5 L (2.91%) | L2 | Rejected-Finance quoted 2.79 above estimate rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified in Technical Evaluation |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
2 Dec 2020, 3:00 pmClosed
Project Director, ,
Project Director, DRDA, Chengalpattu
Upgradation the Road From Mariputhur - Athivakkam to Mettukudisai Road Km.0/0 - 3/984 in Madhuranthakam Panchayat Union in Chengalpattu dist Package TN - 01-154 Under PMGSY III Batch I 2020-21
2020_RDTN_101978_1
TN01154
Open Tender
Civil Works - Roads
Item Rate
270 days
Maduranthagam
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹3.2 L
Yes
Project Director, DRDA, Chengalpattu
19 Feb 2021
26 Oct 2020
2 Dec 2020
26 Oct 2020
2 Dec 2020
26 Oct 2020
4 Nov 2020
Amount
Clearing and Grubing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes,shrubs,saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including remo`val and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.Km 0/000-3/984.
Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 100 m as per Technical Specification clause 301.4 Km 0/000-3/984.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Providing, laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in Mechanical mixer (Pug mill) Carriage of mixered material by tipper to site, laying in uniform layers in subbase / base coat on a well prepared subbase and compacting with smooth wheel roller of 80-100KN weight to achieve the desired density including lighting barricading and maintenance of diversion, etc. as per tables 400.11 and 400.12 and Technical Specification Clause 406
Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per MORD Technical Specification Clause 502
Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 503
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using using CMR bit plast bitumen binder(8 % waste plastic @ 0.784 kg/10 sqm impregnated to Bitumen (S-65) @ 13.432 kg per 10 sqm) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Providing and laying seal coat using CMR bit plast bitumen binder(8 % waste plastic @ 0.784 kg/10 sqm impregnated to Bitumen (S-65) @ 9.016 kg per 10 sqm) sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Construction of RCC Slab Culverts . 1.50m span at Ch.0/005
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 6mm bitumen felt for expansion joint between dirt wall and deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of RCC Slab Culverts . 1.50m span at Ch.0/274
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 6mm bitumen felt for expansion joint between dirt wall and deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of RCC Slab Culverts . 3.0m span at Ch.3/823
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below Sill Level
Below Sill Level
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and Laying Kraft Paper Barring Between deck slab and bed block to the full width of seating
Providing and Fixing 20mm Thick Compressible fibre in expansion joint complete as per drawing and technical specification.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Dismantling existing CD works @ Ch.0/005, 0/274
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry including disposal of unservicable material with all lift and lead of 1000m as per technical specification.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry including disposal of unservicable
Removing all types of Hume pipes and stacking within a lead of 1000m including earthwork and dismanteling of masonry works as per technical specification.
Dismantling existing CD works @ Ch. 3/823
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry including disposal of unservicable material with all lift and lead of 1000m as per technical specification.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry including disposal of unservicable
Removing all types of Hume pipes and stacking within a lead of 1000m including earthwork and dismanteling of masonry works as per technical specification.
Construction of Protective works at Ch.3/120-3/150
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below Ground Level
Above Ground Level body wall
Provision for Kilometer stones
Provision for Hectameter stones
Provision for Guard stones in the all Culvert
Providing and fixing Name Board
Providing and fixing Logo of PMGSY project
Providing and fixing citizen information Board of PMGSY project
Providing and fixing maintenance information Board of PMGSY project
Conforming to IRC:67:2010 and ASTM D4956-09 type-IV specification and fixed over 1.5 mm thick aluminioum sheet fixed on back support frame of 25mm X 25mm X 3mm ms angle and supported on a ms angle iron post 75mm X 75 mm X 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm X 45 cm X 60 cm below GL etc. complete including 7 years warranty for the retro-reflectorised sheeting as per clause 6.9 of IRC67-2010 (as per MORT & specification No 801)
90 cm Equilator triangular Cautionary Sign Board
60 cm Equilator triangular Octogon Sign Board
Curve Board Chevron signs 90cm Octogon
Reflector(Near Culvert & trees)
5 years of Maintanence
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Deepam Constructions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .