CONSTRUCTION OF CC DRAIN IN 1ST MAIN SHANKAR VIHAR LAYOUT A BLOCK IN WARD NO 15
DMA/2025-26/OW/WORK_INDENT40786
DMA/2025-26/OW/WORK_INDENT40786
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Davanagere
₹500
₹41,000
23 Jun 2025
23 Jun 2025
7 Jul 2025
CONSTRUCTION OF CC DRAIN IN 1ST MAIN SHANKAR VIHAR LAYOUT A BLOCK IN WARD NO 15
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work sit...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Form work, centering, scaffolding recommendations of technical working group, rates for formwork shall be added on percentage basis in the finished concrete item rate.for foundation, substrcture of cr...
Form work, centering, scaffolding recommendations of technical working group, rates for formwork shall be added on percentage basis in the finished concrete item rate.for foundation, substrcture of cr...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work Vol-3 I no 3.1 P No 17
Providing and fixing RCC name board of size 1.35x0.60x0.04 m fixed in reinforced cement concrete poles of size 0.10x0.10x2.60m in cement concrete M 20 proportion using 20mm and down size graded metal ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .