Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance WZ 120 BUDHELLA VILLAGE VIKASH PURI WEST DELHI WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | Admitted-Finance |
| 3 | Admitted-Finance B 225 FATEH NAGAR WEST DELHI WEST DELHI WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
5 Jul 2021, 1:00 pmClosed
EE (SDW) VII
NSTP Coronation Pillar Delhi 110009
Renovation of Conveyor Belt System of Bar Screen No 1 at Phase I and II STP Coronation Pillar
2021_DJB_204977_8
NIT No 5 (2021-22)
Open Tender
Miscellaneous Works
Works
15 days
NSTP Coronation Pillar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Online
₹4,100
16 Jul 2021
28 Jun 2021
5 Jul 2021
28 Jun 2021
5 Jul 2021
28 Jun 2021
Renovation of Conveyor Belt of Bar Screen No 1 installed at Phase I&II STP Coronation Pillar by carrying out the following works: Dismantling of the conveyor belt and allied electrical & mechanical items with the help of gas cutter & manual labour.
Replacement of rusted & damaged steel structure with new MS Flat / Angle Iron etc as per the shape & size of the existing structure.
Repairing of main guide roller including machining and replacement of bushes as required.
Re-Fixing of roller in the stand of conveyor belt after oiling, greasing, grinding, welding and thereafter proper alignment of rollers in the press complete in all respect.
Providing/Fixing the conveyor belt with nut, bolt, rubber sheet for joints approx 20 meter Conveyor belt as per site requirement.
Servicing overhauling of 2 HP 3 Phase motor and allied Gear Box. The job also includes providing of pulley and V-Belt as per site requirement.
Replacement of the chain sprockets as per sample
Replacement of the Chain made out of EN-24 metal as per sample
Replacement of the bearing blocks of main
Painting of the steel structure with 1 coat red oxide primer and two coats of anti corrosive paint after the completion of work.
Removing of the sludge deposited in the RCC Channel Between Inlet Chamber & Bar Screen with the help of manual labour after isolating the channel from both ends. The job also includes dumping the sludge below the outlet of the rack.
Testing & commissioning of the conveyor belt after completion of work.
M/S ARYAN TRADERS AND ENGINEERS
M/S.SUPER TRADERS & ENGINEERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .