| 1 | L1₹6.7 LAccepted-AOC 11 B EAST VEERAPANDIYAN STREET VIRUDHACHALAM 606001 | VIRUDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | L1 | Accepted-AOC this contractorquoted very low compared with estimate sanction amount,hence the work awarded | |
| 2 | L2₹6.6 L+₹86,587 (15.1%)Rejected-Finance NO 6 51 SOUTH STREET ATHIYANALLUR KOTHATTAI PO BHUVANAGIRI TK CUDDALORE DIST 608 501 | ATHIYANALLUR | CUDDALORE | TAMIL NADU | 608501 | L2 | Rejected-Finance Financial bid opened ,He is the L2 tenderer | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Samsudeen L1 | ASIA BUILDER L2 |
|---|---|---|---|---|---|
| 1.00Removing old weathering course | |||||
| 2.00 | Dismantling the existing damaged pressed tiles and weathering course, removing the debris faraway from the site with in a lead of 1 km as directed by the Engineer incharge at site including cost of all materials, lead, lift, labour, transport, T&P, etc., complete. | 179 | m2 | 57 ₹10,203 Lowest | 91 ₹16,289 |
| 3.00 | Providing screed concrete with PCC 1:2:4 mix using 6 to 3 mm HBG metal over RCC roof slab to an average thickness with required slope laid over two coats of Latex Modified Acrylic Liquid Mixer Coating as directed by the Engineer incharge at site including cost of all materials, labour, curing, lead, lift, T&P, etc., complete. | 11 | m3 | 5,400 ₹59,400 Lowest | 10,001 ₹1,10,011 |
| 4.00 | Providing laying of solar reflective ceramic cooling tiles of size 305mmX305mmX7mm above the roof slab embedded in 20mm thick cement mortar 1:3 mixed with water proofing compound and pointed with tile joint with epoxy grout finishing neatly as directed by the Engineer incharge at site including cost of all materials, labour, lead, lift, T&P, etc., complete. | 179 | m2 | 1,260 ₹2,25,540 | 1,201 ₹2,14,979 Lowest |
| 5.00 | Dismantling the existing damaged doors & windows including removing frames hinges fastening etc devoluting them to store | 6 | m2 | 99 ₹594 Lowest | 101 ₹606 |
| 6.00 | Plastering with CM 1:5 12mm thick including cost of all material , labour, lead, lift etc.. Complete | 32 | m2 | 241 ₹7,712 Lowest | 251 ₹8,032 |
| 7.00 | Flooring with approved spartex ceramic of non slippery type tiles over cement mortr 1:3,12mm thick including pointing with white cement finishing the joints ,flush pointing the surface etc..,complete | 14 | m2 | 1,260 ₹17,640 Lowest | 1,501 ₹21,014 |
| 8.00 | Repairing the concrete roof ceiling by chipping and removing the cracked or any other pre applied mortar,applied one coat RHEOMIX 141 admixed with the cement over the exposed and cleaned concrete surface as per the manufacturer,s specification,plastering with micro concrete over the spalled concrete surface and finishing with 1:5 cement mortar including all costs. | 14 | m2 | 207 ₹2,898 Lowest | 451 ₹6,314 |
| 9.00 | Supplying and fixing ofsingle leaf steel doors using MS angle ,20mm gauge sheet as per the instruction of the engineer incharge (consider door size 1.2x2.43 | 7 | m2 | 5,400 ₹37,800 Lowest | 5,501 ₹38,507 |
| 10.00 | white washing two coats with white cement to the beam soffit & Ceiling etc,including cost of all materials labour lead lift etc.,complete. | 173 | m2 | 108 ₹18,684 | 51 ₹8,823 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,094
Closing Date
2 Jun 2025, 12:00 pmClosed
Superintending Engineer cedc capperhills cuddalore
Superintending Engineer cedc capperhills cuddalore
Improvement work by replacing the existing damaged weathering course and pressed tiles with solar reflective cooling tiles flooring plastering and colour washing for Koranapttu 110 3311 KV SS at Koranapttu
2025_EB_559200_1
01/2025-2026
Open Tender
Civil Works
Works
Koranapattu
please refer tender documents
2 documents required · 2 mandatory
₹0
₹8,094
Yes
18 Sept 2025
17 May 2025
3 Jun 2025
17 May 2025
2 Jun 2025
17 May 2025
Amount
Removing old weathering course
Dismantling the existing damaged pressed tiles and weathering course, removing the debris faraway from the site with in a lead of 1 km as directed by the Engineer incharge at site including cost of all materials, lead, lift, labour, transport, T&P, etc., complete.
Providing screed concrete with PCC 1:2:4 mix using 6 to 3 mm HBG metal over RCC roof slab to an average thickness with required slope laid over two coats of Latex Modified Acrylic Liquid Mixer Coating as directed by the Engineer incharge at site including cost of all materials, labour, curing, lead, lift, T&P, etc., complete.
Providing laying of solar reflective ceramic cooling tiles of size 305mmX305mmX7mm above the roof slab embedded in 20mm thick cement mortar 1:3 mixed with water proofing compound and pointed with tile joint with epoxy grout finishing neatly as directed by the Engineer incharge at site including cost of all materials, labour, lead, lift, T&P, etc., complete.
Dismantling the existing damaged doors & windows including removing frames hinges fastening etc devoluting them to store
Plastering with CM 1:5 12mm thick including cost of all material , labour, lead, lift etc.. Complete
Flooring with approved spartex ceramic of non slippery type tiles over cement mortr 1:3,12mm thick including pointing with white cement finishing the joints ,flush pointing the surface etc..,complete
Repairing the concrete roof ceiling by chipping and removing the cracked or any other pre applied mortar,applied one coat RHEOMIX 141 admixed with the cement over the exposed and cleaned concrete surface as per the manufacturer,s specification,plastering with micro concrete over the spalled concrete surface and finishing with 1:5 cement mortar including all costs.
Supplying and fixing ofsingle leaf steel doors using MS angle ,20mm gauge sheet as per the instruction of the engineer incharge (consider door size 1.2x2.43
white washing two coats with white cement to the beam soffit & Ceiling etc,including cost of all materials labour lead lift etc.,complete.
colour washing two coats of approved interior emulsion paints over one coat of white cement primer for wall including cost of all materials labour lead lift,etc.,complete
colour washing two coats with exterior emulsion paints over one coat of white cement primer for outside wall including cost of all materials labour lead lift,etc.,complete
Manufacturing and fixing of Name Board of the size 2.00x1.20m using 35x35x5mm MS angle as outer frame 35x5mm MS flate as stiffness,2 nos vertical and one number horizontal 100x50mm MS channals support for 3.60m height for fixing of board with proper anchoring and using 18 SWG MS Sheet for name board and painting emblem lettering and all lead lift etc.,complete
Brick work in CM 1:6 using second class ground moulded chamber burnt brick of size (9"x4 3/8"x2 3/4")including cost of all material lead lift labour etc complete
ASIA BUILDER (BID ID -1356089)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .