Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.6 LAccepted-AOC | ₹5.6 L Quoted ₹6.7 L | L-1 | Accepted-AOC Lowest bidder |
| 2 | L-2₹6.8 L+₹9,324.68 (1.40%)Rejected-Finance | ₹6.8 L+₹9,324.68 (1.40%) | L-2 | Rejected-Finance Rejected |
| 3 | L-3₹6.8 L+₹14,365.84 (2.16%)Rejected-Finance | ₹6.8 L+₹14,365.84 (2.16%) | L-3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | happy kaith L2 | MANISH KUMAR L3 | Trilok Bhaluni Govt Contractor L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | 6 | Cum. | 560 ₹3,360 | 570 ₹3,420 | 550 ₹3,300 Lowest |
| 2.00 | Providing and laying cement concrete 1:5:10 ( 1 cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads & lifts and as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 62.4 | Cum. | 8,300 ₹5,17,920 | 8,300 ₹5,17,920 | 8,200 ₹5,11,680 Lowest |
| 3.00Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work complete as per direction & to the entire satisfaction of the Engineer-in-Charge. in :- | ||||||
| 3.01 | In Columns, Pillars post and struts. | 4.75 | Cum | 10,600 ₹50,350 | 10,700 ₹50,825 | 10,500 ₹49,875 Lowest |
| 4.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
| 4.01 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | 54.24 | Sqmt. | 560 ₹30,374.4 | 570 ₹30,916.8 | 550 ₹29,832 Lowest |
| 4.02 | In Columns, Pillars post and struts. | 63.36 | Sqmt. | 670 ₹42,451.2 | 680 ₹43,084.8 | 650 ₹41,184 Lowest |
| 5.00 | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | 190.08 | kg | 96 ₹18,247.68 | 98 ₹18,627.84 | 95 ₹18,057.6 Lowest |
| 6.00 | Stone/ Boulder filling behind the R/Wall, also under Floor & Upstream of I/Gallary/ Under Floor etc. in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge | 1.5 | Cum. | 3,100 ₹4,650 | 4,000 ₹6,000 | 3,000 ₹4,500 Lowest |
| 7.00 | Providing & fixing weaphole of PVC pipe of 100 mm diameter complete within all leads & lifts and to the entire satisfaction of the Engineer-in-Charge. | 40 | Rmt. | 210 ₹8,400 | 250 ₹10,000 | 200 ₹8,000 Lowest |
Tender Value
₹6.0 L
EMD Value
₹12,093
Closing Date
16 Apr 2026, 5:00 pmClosed
EE Rampur
JSD Rampur
/R MO WSS Rampur Town
2026_HPIPH_133752_1
EE-JSD-RMP-E-Ten/25-70-120 dt 07.04.2026
Open Tender
Civil Works
Item Rate
60 days
Rampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹12,093
15 Sept 2026
8 Apr 2026
17 Apr 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | - | Cum. | - | - |
| - | Providing and laying cement concrete 1:5:10 ( 1 cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads & lifts and as per the direction & to the entire satisfaction of the Engineer-in-Charge. | - | Cum. | - | - |
| - | Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work complete as per direction & to the entire satisfaction of the Engineer-in-Charge. in :- | - | - | - | - |
| - | In Columns, Pillars post and struts. | - | Cum | - | - |
| - | Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | - | - | - | - |
| - | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | - | Sqmt. | - | - |
| - | In Columns, Pillars post and struts. | - | Sqmt. | - | - |
| - | Providing mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel. | - | kg | - | - |
| - | Stone/ Boulder filling behind the R/Wall, also under Floor & Upstream of I/Gallary/ Under Floor etc. in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge | - | Cum. | - | - |
| - | Providing & fixing weaphole of PVC pipe of 100 mm diameter complete within all leads & lifts and to the entire satisfaction of the Engineer-in-Charge. | - | Rmt. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_197745.xls
BOQ • 0.28 MB
TC.pdf
Tender Documents • 0.16 MB
F6.pdf
Tender Documents • 0.68 MB
F8.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .