| Sl No | Description | Qty | Unit | P RAYIN L1 | P. RAYIN CONSTRUCTIONS COMPANY PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 258 | m3 | 156.19 ₹40,297.02 Lowest | 159.16 ₹41,063.28 |
| 2.00 | Earthwork excavation for open cutting in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 419 | m3 | 234.29 ₹98,167.51 Lowest | 238.75 ₹1,00,036.25 |
| 3.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 1,247 | m2 | 27.7 ₹34,541.9 Lowest | 28.23 ₹35,202.81 |
| 4.00 | Centering for sides and soffits of R.C.C. slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. complying with std. specifications. | 119 | m3 | 8,209.9 ₹9,76,978.1 Lowest | 8,366.28 ₹9,95,587.32 |
| 5.00Centering for sides and soffits of R.C.C. slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. complying with std. specifications. | |||||
| 5.01 | 5.01) Below 1.00 m Height | 1,109 | m2 | 391.41 ₹4,34,073.69 Lowest | 398.86 ₹4,42,335.74 |
| 5.02 | 5.02) Above 1.00 m Height | 726 | m2 | 782.83 ₹5,68,334.58 Lowest | 797.74 ₹5,79,159.24 |
| 6.00 | Supplaying and fabrication of Steel and placing in position of TMT steel road for RCC works as per design given including cost of steel and GI binding wire in all floors ect,. Complete complying with standard specification in TNDSS NO:97 V, VI (S6) VII (S6), VII-3 | 21,360 | kg | 103.73 ₹22,15,672.8 Lowest | 105.71 ₹22,57,965.6 |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. | 267 | m3 | 12,555.22 ₹33,52,243.74 Lowest | 12,794.36 ₹34,16,094.12 |
| 8.00 | Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 40% of 40mm size and 60% of 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specification | 370 | m3 | 8,883.85 ₹32,87,024.5 Lowest | 9,053.07 ₹33,49,635.9 |
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
12 Apr 2023, 3:00 pmClosed
The Executive Officer, Devarshola Town Panchayat
O/o Devarshola TownPanchayat, Devarshola, The Nilgiris District. 643207
Strengthening of B.T. road at Alavayal to No.III Division in Devarshola Town Panchayat
2023_DTP_291876_1
90/2023
Open Tender
Civil Works - Roads
Works
180 days
Devarshola
Refer tender document
2 documents required · 2 mandatory
₹0
₹2.2 L
Yes
Devarshola Town Panchayat
22 Sept 2025
1 Mar 2023
12 Apr 2023
1 Mar 2023
12 Apr 2023
1 Mar 2023
1 Mar 2023 - 12 Apr 2023
9 Mar 2023
Amount
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Earthwork excavation for open cutting in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Centering for sides and soffits of R.C.C. slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. complying with std. specifications.
Centering for sides and soffits of R.C.C. slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. complying with std. specifications.
5.01) Below 1.00 m Height
5.02) Above 1.00 m Height
Supplaying and fabrication of Steel and placing in position of TMT steel road for RCC works as per design given including cost of steel and GI binding wire in all floors ect,. Complete complying with standard specification in TNDSS NO:97 V, VI (S6) VII (S6), VII-3
Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.
Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 40% of 40mm size and 60% of 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specification
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Road marking with Hot Applied Thermo Plastic Compound with Reflectorising Glass Beads on Bituminious Surface Proving and Laying of Hot Applied thermoplastic Compound 2.5 mm thick inculding reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm exclusive of surface applied glass beads As Per IRC: 35 The finished surface to be level uniform and free from streaks and holes Inculding all Charges etc.., complete
Maintenance
Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
Centering for sides and soffits of R.C.C. slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. complying with std. specifications.
16.01) Upkeeping 1st year (50%)
16.02) Upkeeping 2 nd year (60%)
16.03) Upkeeping 3 rd year (60%)
16.04) Upkeeping 4 th year (60%)
16.05) Upkeeping 5 th year (60%)
Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20B for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Once in a year]
17.01) Upkeeping 1st year (40%)
17.02) Upkeeping 2 nd year (40%)
17.03) Upkeeping 3 rd year (40%)
17.04) Upkeeping 4 th year (40%)
17.05) Upkeeping 5 th year (40%)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503
18.01) Upkeeping for 4th year
18.02) Upkeeping for 5th year
Bituminous Concrete (Table 500-17): Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.507 complete in all respects) - Grading-II
19.01) Upkeeping for 4th year
19.02) Upkeeping for 5th year
P. RAYIN CONSTRUCTIONS COMPANY PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .