| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | GROUP-1 (SITC OF 3-Phase 10 KVA UPS with Battery Bank) | GEBEXY INDIA PRIVATE LIMITED | 11 | - |
| 2 | GROUP-2 (SITC OF 3-Phase 20 KVA UPS with Battery Bank) | GEBEXY INDIA PRIVATE LIMITED | 11 | - |
| 3 | GROUP-3 (SITC OF 3-Phase 30 KVA UPS with Battery Bank) | GEBEXY INDIA PRIVATE LIMITED | 11 | - |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
15 Jan 2025, 10:00 amClosed
C23640002890A Supply of 3 phase 10 KVA UPS
100000000000B Installation
Testing and Commissioning of 3 phase 10 KVA UPS
100000000000C
100000000000D
100000000000E
100000000000F
100000000000G
C23640002793H Supply of 3 phase 20 KVA UPS
100000000000I Installation
Testing and Commissioning of 3 phase 20 KVA UPS
100000000000J
100000000000K
100000000000L
100000000000M
100000000000N
C23640002987O Supply of 3 phase 30 KVA UPS
100000000000P Installation
Testing and Commissioning of 3 phase 30 KVA UPS
100000000000Q
100000000000R
100000000000S
100000000000T
100000000000U
7333073
GEM/2025/B/5781315
Two Packet Bid
C23640002890A Supply of 3 phase 10 KVA UPS
45 days
Uttar Pradesh; Ghaziabad
Group wise evaluation
BOQ
1 document required · 1 mandatory
Exempted
22 Jan 2025
4 Jan 2025
15 Jan 2025
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | C23640002890A Supply of 3 phase 10 KVA UPS | Supply of 3 phase 10 KVA UPS with battery bank and Accessories with minimum 30 Minute back up time on full load at BEL Ghaziabad. | 5 | NO | con5.bel.gzb | 45 |
| 2 | 100000000000B Installation, Testing and Commissioning of 3 phase 10 KVA UPS | Installation, Testing and Commissioning of 3 phase 10 KVA UPS with battery bank and Accessories | 5 | NO | con5.bel.gzb | 45 |
| 3 | 100000000000C | CAMC of 3 PHASE 10 KVA UPS charges for 1st year after warranty | 5 | No | con5.bel.gzb | 45 |
| 4 | 100000000000D | CAMC of 3 PHASE 10 KVA UPS charges for 2nd year after warranty | 5 | No | con5.bel.gzb | 45 |
| 5 | 100000000000E | CAMC of 3 PHASE 10 KVA UPS charges for 3rd year after warranty | 5 | No | con5.bel.gzb | 45 |
| 6 | 100000000000F | CAMC of 3 PHASE 10 KVA UPS charges for 4th year after warranty | 5 | No | con5.bel.gzb | 45 |
| 7 | 100000000000G | CAMC of 3 PHASE 10 KVA UPS charges for 5th year after warranty | 5 | No | con5.bel.gzb | 45 |
| 8 | C23640002793H Supply of 3 phase 20 KVA UPS | Supply of 3 phase 20 KVA UPS with battery bank and Accessories with minimum 30 Minute back up time on full load at BEL Ghaziabad. | 1 | No | con5.bel.gzb | 45 |
| 9 | 100000000000I Installation, Testing and Commissioning of 3 phase 20 KVA UPS | Installation, Testing and Commissioning of 3 phase 20 KVA UPS with battery bank and Accessories | 1 | No | con5.bel.gzb | 45 |
| 10 | 100000000000J | CAMC of 3 PHASE 20 KVA UPS charges for 1st year after warranty | 1 | No | con5.bel.gzb | 45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7333073.pdf
GEM_BID
techspecsups_2025-01-04-09-09-53_faf6d46e2be09c7bcb513f9829b2050d.pdf
BOQ
boq_item_sample_file_2025-01-04-09-09-53_36d15ab430dd136366045b6b358773c0.csv
BOQ
ATC_217951ce-ac8b-4460-afb61735964718947_buyer6.bel.gzb.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .