| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.0 Cr+₹3.7 Cr (108.5%)Admitted-Finance | ₹7.0 Cr+₹3.7 Cr (108.5%) | L2 | Admitted-Finance |
| 3 | L3₹7.4 Cr+₹4.1 Cr (120.7%)Admitted-Finance | ₹7.4 Cr+₹4.1 Cr (120.7%) | L3 | Admitted-Finance |
| 4 | L4₹7.8 Cr+₹4.4 Cr (130.5%)Admitted-Finance | ₹7.8 Cr+₹4.4 Cr (130.5%) | L4 | Admitted-Finance |
| 5 | L5₹8.3 Cr+₹4.9 Cr (146.4%)Admitted-Finance | ₹8.3 Cr+₹4.9 Cr (146.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENERINFRA PRIVATE LIMITED L3 | Mansi Ganga Builders and Engineers Pvt Ltd L7 | ZENEX ENGINEERING PVT LTD L6 | DSPC Engineering Pvt Ltd L5 | NEXT LEVEL PROJECTS PRIVATE LIMITED L8 | ANERI CONSTRUCTION PRIVATE LIMITED L4 | Dipak Construction L1 | Vichitra Constructions Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CROSSINGS/LAYING ALONG THE ROAD BY HDD METHOD | |||||||||||
| 2.00Complete work of pipeline crossing by Horizontal Directional Drilling (HDD) method, within the limits as defined in approved drawings, including engineering, surveys (Geo-Technical & Utility Survey), approvals, Liasoning, execution, testing, and commissioning, in accordance with Contract Documents, applicable codes, specifications, and instructions of the Engineer-in-Charge. | |||||||||||
| 3.001. Transportation & Handling Receiving and taking over Owner-supplied three-layer PE coated line pipes from Owner’s designated storage/issue point and transportation to Contractor’s stockyard/workshop/worksite, including all loading, unloading, handling, stacking, shifting, alignment, and safe storage. | |||||||||||
| 4.002. Engineering, Surveys & Approvals Detailed pre-construction surveys based on site visits Collection of historical and utility data from concerned authorities. Design calculations, profile design, stress analysis, minimum cover calculations as per applicable codes Detailed engineering and preparation of HDD crossing drawings Submission of drawings, calculations, and methodology for approval of Owner / Engineer-in-Charge / concerned statutory authorities Obtaining any NOC and utility crossing clearances prior to commencement of work | |||||||||||
| 5.003. Mobilization Mobilization of all manpower, HDD rigs, equipment, tools, consumables, machinery, utilities, temporary facilities, and acquisition of land (if required) for storage, fabrication, and execution. | |||||||||||
| 6.004. Pipe String Preparation Stringing and preparation of pipes Welding including welding repairs Radiography / NDT and retesting Field joint coating using special type Heat Shrink Sleeve (Dirax or equivalent) Coating repairs using PERP-80 or equivalent approved repair materials Pre-hydrotesting of complete pipe strings prepared for HDD crossing | |||||||||||
| 7.005. HDD Execution Pilot drilling to the approved alignment and depth Reaming (one or multiple stages as required) to achieve the required bore diameter Maintaining bore stability in all soil/rock strata encountered Pulling / installation of pipeline string through HDD bore using approved methods including tie-in joints Ensuring minimum cover as per codes/specifications or as decided by the concerned authority, whichever is more | |||||||||||
| 8.006. Testing Post-installation hydrotesting of HDD section, including dewatering Pigging, cleaning, gauging, and final hydrotesting in coordination with mainline works Tie-in welding with adjacent pipeline sections and associated testing | |||||||||||
| 9.007. Restoration & Clean-Up Backfilling of entry/exit pits, restoration of road/ground, disposal of waste materials, and complete site clean-up to the satisfaction of the Engineer-in-Charge and concerned authorities. | |||||||||||
| 10.00 | Crossing/Laying of carrier pipeline of size 250 (approx.) mm NB x 6.4 mm thk. of API 5L Gr. X52 (along with laying of 4'' Steel Pipe for MDPE) by HDD Method . . | 1,400 | Meter | 45,000 ₹7,43,40,000 | 64,900 ₹10,72,14,800 | 54,475 ₹8,99,92,700 | 50,240 ₹8,29,96,480 | 96,000 ₹13,44,00,000 | 47,000 ₹7,76,44,000 | 20,388 ₹3,36,80,976 Lowest | 42,500 ₹7,02,10,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
2 Apr 2026, 3:00 pmClosed
GM C and P
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune - 411045
TENDER FOR HDD WORK FOR CROSSING OF GHOTI TOWN TO COMPLETE THE STEEL PIPELINE PROJECT FROM GONDE TO IGATPURI MIDC IN NASHIK GA
2026_MNGL_272233_1
MNGL/CP/2025-26/160
Open Tender
Miscellaneous Works
Works
150 days
Nashik
As per tender terms and conditions
17 documents required · 17 mandatory
₹0
₹2 L
Yes
Online
4 May 2026
19 Mar 2026
3 Apr 2026
19 Mar 2026
2 Apr 2026
19 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CROSSINGS/LAYING ALONG THE ROAD BY HDD METHOD | |||||
| 2Complete work of pipeline crossing by Horizontal Directional Drilling (HDD) method, within the limits as defined in approved drawings, including engineering, surveys (Geo-Technical & Utility Survey), approvals, Liasoning, execution, testing, and commissioning, in accordance with Contract Documents, applicable codes, specifications, and instructions of the Engineer-in-Charge. | |||||
| 31. Transportation & Handling Receiving and taking over Owner-supplied three-layer PE coated line pipes from Owner’s designated storage/issue point and transportation to Contractor’s stockyard/workshop/worksite, including all loading, unloading, handling, stacking, shifting, alignment, and safe storage. | |||||
| 42. Engineering, Surveys & Approvals Detailed pre-construction surveys based on site visits Collection of historical and utility data from concerned authorities. Design calculations, profile design, stress analysis, minimum cover calculations as per applicable codes Detailed engineering and preparation of HDD crossing drawings Submission of drawings, calculations, and methodology for approval of Owner / Engineer-in-Charge / concerned statutory authorities Obtaining any NOC and utility crossing clearances prior to commencement of work | |||||
| 53. Mobilization Mobilization of all manpower, HDD rigs, equipment, tools, consumables, machinery, utilities, temporary facilities, and acquisition of land (if required) for storage, fabrication, and execution. | |||||
| 64. Pipe String Preparation Stringing and preparation of pipes Welding including welding repairs Radiography / NDT and retesting Field joint coating using special type Heat Shrink Sleeve (Dirax or equivalent) Coating repairs using PERP-80 or equivalent approved repair materials Pre-hydrotesting of complete pipe strings prepared for HDD crossing | |||||
| 75. HDD Execution Pilot drilling to the approved alignment and depth Reaming (one or multiple stages as required) to achieve the required bore diameter Maintaining bore stability in all soil/rock strata encountered Pulling / installation of pipeline string through HDD bore using approved methods including tie-in joints Ensuring minimum cover as per codes/specifications or as decided by the concerned authority, whichever is more | |||||
| 86. Testing Post-installation hydrotesting of HDD section, including dewatering Pigging, cleaning, gauging, and final hydrotesting in coordination with mainline works Tie-in welding with adjacent pipeline sections and associated testing | |||||
| 97. Restoration & Clean-Up Backfilling of entry/exit pits, restoration of road/ground, disposal of waste materials, and complete site clean-up to the satisfaction of the Engineer-in-Charge and concerned authorities. | |||||
| 10 | Crossing/Laying of carrier pipeline of size 250 (approx.) mm NB x 6.4 mm thk. of API 5L Gr. X52 (along with laying of 4'' Steel Pipe for MDPE) by HDD Method . . | 1,400 | Meter | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Volume_II.pdf
Tender Documents • 3.51 MB
Tender_Nashik_HDD_Vol_I.pdf
Tender Documents • 2.55 MB
BOQ_317615.xls
BOQ • 0.26 MB
Replytobidders31032026.pdf
PDF • 0.17 MB
Replytobidders30032026.pdf
PDF • 0.16 MB
SiteVisitDetails160.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .