Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹31,044 (12.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.6 L+₹1.0 L (39.1%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.0 L
EMD Value
₹11,940
Closing Date
27 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
c/o edgewall alongwith drain at janazgah jamia masjid
2026_RDPR_316703_19
ENIT68of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹11,940
28 Jul 2026
18 Jul 2026
28 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | SITE CLEARANCE BWO REMOVING UNWATED MATERIAL | - | no | - | - |
| 0.0 | EARTH WORK IN EXCAVATION BY MANUAL MEANS | 1 | Cum | - | - |
| 0.0 | P/L of stone Soling tightly handpacked and tamped manually incl carriage OF 15 KM and 10% Voids deduction (to be paid as per actual) I/C plum in c/c | 1 | Cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:2:4) and by using 20 mm down aggregates | 1 | Cum | - | - |
| 0.0 | P/F of shuttering using ordinary timber planks of wood including its removal. | - | Sqm | - | - |
| 0.0 | Filling earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and waterING I/C CARRIAGE OF 5 KMS | - | Cum | 1 | - |
| 0.0 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 25 kms and h/l of 100 m | - | Cum | - | - |
| 0.0 | p/f of sign board/ photographs/pipe plastic | - | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1034621.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .