Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical BADRI RAI COMPANY ARUN KUMAR RAI DULIAJAN STATION ROAD P O DULIAJAN P S DULIAJAN DIBRUGARH PIN 786602 | DULIAJAN | DIBRUGARH | ASSAM | 786602 | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Rejected-Technical 1ST FLOOR GAUTAM NIWAS NORTH OAK SANJAULI SHIMLA HIMACHAL PRADESH 171006 | SHIMLA | HIMACHAL PRADESH | 171006 | Rejected-Technical Disqualified |
Tender Value
₹10.9 Cr
EMD Value
₹21.8 L
Closing Date
26 Oct 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager, Zone-1, Prayagraj
General Manager, Zone-1, U. P. Projects Corporation Ltd. 230 /1A, Mehdaury, Telirayganj District-Prayagraj
Construction of Transit Hostel in Police Line of District Kaushambi.
2023_UPPRC_852890_1
56/GM-1/UPPCL/2023-24/E-TENDER Dated-12.10.2023
Open Tender
Civil Works - Buildings
Percentage
730 days
District Kaushamb
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
Project Manager, Unit-02, Prayagraj
₹21.8 L
Yes
31 Oct 2023
18 Oct 2023
26 Oct 2023
18 Oct 2023
26 Oct 2023
18 Oct 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Transit Hostel in Police Line of District Kaushambi | - | - | - | - |
| 2 | (A) CIVIL WORK | - | - | - | - |
| 3 | Excavation in foundation in ordinary Soil ( Loam clay or sand ) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30 m.from foundation trenches. | 600.53 | cum | 152 | ₹91,280.56 |
| 4 | Add for every additional 30m lead or part of 30m or for every additional 1.5 m lift or part of 1.5m. | 32.91 | cum | 23.75 | ₹781.61 |
| 5 | Filling of available excavated earth in trenches, plinth, sides of foundation etc. inlayers not exceeding 20 cms in depth, consolidating each deposited layer by ramming and watering including lead upto 50m & lift upto 1.50m. | 200.18 | cum | 104.5 | ₹20,918.81 |
| 6 | Filling By carted earth in trenches, plinth, sides of foundation, campus etc. in layers not exceeding 20 cms in depth, consolidating each deposited layer by ramming and watering including lead upto 50 m & lift upto 1.50 m. | 53.65 | cum | 344.85 | ₹18,501.2 |
| 7 | Sand filling in plinth & in foundation for saltpeter treatment including supply of necessary quantity of sand from a distance not exceeding 8.00Kms. From the site of work including watering, dressing etc. labour & T &P etc. required for proper completion of work saplings of girth upto 30 ground level and removal of rubbish upto a distsnce of 50m out side the periphery of area cleared. Coarse sand. | 61.32 | cum | 1,861.05 | ₹1,14,119.59 |
| 8 | Providing and laying Cement concrete 1:4:8 (1cement :4 coarse sand :8 graded stone ballast 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation. | 86.6 | cum | 4,655 | ₹4,03,123 |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | 369.75 | cum | 6,884.3 | ₹25,45,469.93 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Concrete of M25 grade with minimum cement content of 330 kg /cum | 1,277.63 | cum | 8,170.49 | ₹1,04,38,863.14 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1438441.xls
BOQ Document • 2.43 MB
131792699.pdf
Tender Document • 1.39 MB
BIDDOC56.pdf
Tender Document • 6.39 MB
131792701.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .