Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | +3.00% | ₹2.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
24 Aug 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_321095_8
2ND Call e-NIT No. 106 REW UDHAMPUR of 2026-27 Dated 14-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹3,880
27 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earh Work in Bulk Excavation in all kind of soils disposal lead 50m and lift upto 1.5 m By manual means | 21.98 | cum | 592.9 | ₹13,031.94 |
| 3 | Earh Work in Bulk Excavation in all kind of soils disposal lead 50m and lift upto 1.5 m By manual means | 17.06 | cum | 687.1 | ₹11,721.93 |
| 4 | Earh Work in Bulk Excavation in all kind of soils disposal lead 50m and lift upto 1.5 m By manual means | 11.06 | cum | 810.85 | ₹8,968 |
| 5 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 1.19 | cum | 479.3 | ₹570.37 |
| 6 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 0.72 | cum | 4,826.5 | ₹3,475.08 |
| 7 | P/Laying R.R. stone masonry laid in 1:6 mix using n/stones | 18.48 | Cum | 5,402.9 | ₹99,845.59 |
| 8 | P/Laying R.C.C. 1:1.5:3 mix using 20 mm n/s agg and curing complete | 1.99 | Cum | 7,788.4 | ₹15,498.92 |
| 9 | Steel in R.C.C. including bending binding and placing in position | 139.3 | KG | 123.2 | ₹17,161.76 |
| 10 | P/Laying 50mm thick c.conc flooring in 1:2:4 mix using 20mm n/s agg ad curing complete | 2.36 | SQm | 571 | ₹1,347.56 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1070597.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].