| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹5.1 L+₹14,820.97 (2.97%)Rejected-Finance AMBARI PO KAMALA BAGAN DIST DARJEELING WEST BENGAL 734 426 | DARJEELING | WEST BENGAL | 734426 | ₹5.1 L+₹14,820.97 (2.97%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.2 L+₹24,352.31 (4.88%)Rejected-Finance | ₹5.2 L+₹24,352.31 (4.88%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
17 Feb 2026, 11:00 amClosed
Executive Engineer (civil HQ)
The Executive Engineer (C ) HQ at 48, Market Street, Kolkata - 87
ANNUAL CIVIL MAINTENANCE WORK AT CHAPLIN BHAVAN IN THE FINANCIAL YEAR OF 2026-27
2026_KMC_1002500_1
KMC/DG(C)/EEC/HQ/25-26
Open Tender
CIVIL WORKS
Percentage
365 days
KMC AREA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10,000
20 Jul 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 131 | SQM | 19 | ₹2,489 |
| 2 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 28. Renewing hinge of steel shutter including taking out old one by cutting and fixing new hinges by welding and mending good damages complete. NOTE:(1)Without the specific permission of the Superintending Engineer no work involving 1st class best Indian teak and Siliguri: Sal wood should be carried out. (2) In case of of using under specified timber in frame, shutter etc. penal rate of reduction to a maximum of 50% will be made in such under specified timber work. | 31 | EA | 190 | ₹5,890 |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster | 10 | SQM | 129 | ₹1,290 |
| 4 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster | 15 | SQM | 133 | ₹1,995 |
| 5 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster | 17 | SQM | 137 | ₹2,329 |
| 6 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster | 10 | SQM | 141 | ₹1,410 |
| 7 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster | 22 | SQM | 145 | ₹3,190 |
| 8 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 7. Reparing collapsible gate by cutting out all rivets as necessary reassambling all members including welding pieces of channels, sraightening bent bars and rivetting with new rivets and fitting in position and painting two coats. | 7.2 | SQM | 379 | ₹2,728.8 |
| 9 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 10)Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr. Note : For lift beyond initial 6 mtr. the rate will be increased @ 20% for each additional lift if 6 mtr. or part thereof. | 45 | EA | 50 | ₹2,250 |
| 10 | BUILDING WORKS(R) ALUMINIUM WORKS??(12)Supplying 4 lever mortice lock or any approved make and brand as per direction of the Engineer- in -Charge.(i) 150 mm. | 6 | EA | 378 | ₹2,268 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
form.pdf
Tender Documents • 1.14 MB
C1.pdf
Additional Documents • 4.88 MB
BOQ_2457695.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .