Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-AOC | 1 | Accepted-AOC ok | |
| 2 | 2₹3.2 L+₹47,475.81 (17.1%)Rejected-Finance 92D BAJAJ COLONY NEAR GRAIN MARKET GHARAUNDA DISTT KARNAL | GHARAUNDA | KARNAL | HARYANA | 2 | Rejected-Finance L2 | |
| 3 | 3₹3.4 L+₹58,651.27 (21.1%)Rejected-Finance H NO 309 NEAR SHIV MANDIR MUND ASSANDH DISTT KARNAL | ASSANDH | KARNAL | HARYANA | 3 | Rejected-Finance L3 | |
| 4 | 4₹3.4 L+₹58,651.27 (21.1%)Rejected-Finance H NO 08 LATIF GARDEN ASSANDH ROAD PANIPAT | PANIPAT | HARYANA | 132101 | 4 | Rejected-Finance L4 | |
| 5 | 5₹3.9 L+₹1.1 L (39.8%)Rejected-Finance HOUSE NO 685 SECTOR 7 URBAN ESTATE KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | The Quality Coop Society Ltd L4 | THE SHRI BALAJI COOP L AND C SOCIETY KARNAL L5 | The Mahaluxmi Co-op L&C Society Ltd. L7 | THE AB COOP LABOUR AND CONSTRUCTION SOCIETY PANIPAT L8 | The om mani co-op L&C Society LTD L6 | THE JAI MAHA MAI COOPERATIVE L & C SOCIETY LIMITED RASIN L9 | THE JAI SHREE SHYAM COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD. GHARAUNDA L1 | The gagan cooperative labour and construction society ltd. L3 | The Mahabali Coop. L&C Society Ltd. Gharaunda Karnal L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Grfty work and Salogan on walls including preparation of surface Primer coat, Painting with approved make (Assian, Nerolac etc.) with photo image 80% and 20% words matter work on walls with Labour complete in all respect as per direction of the Engineer-in-charge | 8,740 | SQFT | 24 ₹2,09,760 | 22.89 ₹2,00,058.6 | 23.25 ₹2,03,205 | 28 ₹2,44,720 | 26 ₹2,27,240 | 35 ₹3,05,900 | 17.9 ₹1,56,446 | 20 ₹1,74,800 | 9.5 ₹83,030 Lowest |
Tender Value
₹4.6 L
EMD Value
₹9,300
Closing Date
27 Apr 2026, 5:00 pmClosed
ShSandeep
Municipal Committee Gharaunda
Wall Painting in Harizan Samshan Ghat Malikpur Road MC Gharaunda
2026_HRY_516146_1
2026FA3927F9 4D23 42FC 8BF1 E338CB5EEB39312ULB
Open Tender
Civil Works
Works
120 days
Gharunda
2 documents required · 2 mandatory
₹1,000
Yes
₹9,300
Yes
9 Jun 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Grfty work and Salogan on walls including preparation of surface Primer coat, Painting with approved make (Assian, Nerolac etc.) with photo image 80% and 20% words matter work on walls with Labour complete in all respect as per direction of the Engineer-in-charge | - | SQFT | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_594996.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .