Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹9,400
Closing Date
23 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE VGTPS
VGTPS, Ramanathapuram - 623536
Carrying out Operation and Regular Maintenance of Fire Protection System for a period of Six months from 01.04.2021 to 30.09.2021.
2021_EB_194807_1
SE/VGTPS/RMD/WC.NO.167/20-21
Open Tender
Miscellaneous Works
Works
180 days
VGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,400
Yes
24 Feb 2021
9 Feb 2021
24 Feb 2021
9 Feb 2021
23 Feb 2021
9 Feb 2021
180 days
Amount
Periodical Maintenance
Fire Protection System: Operation: (a) Checking and maintaining the required water pressure in the Fire Hydrant and Spray systems. (b) To carryout periodical water flow test in the deluge valves of spray system. (c) Running of motor and diesel engine driven pumps in hydrant and spray systems for minimum of 5 mints daily. (d) Checking the healthiness of batteries in Fire Water Pump House and DG set. (e) Checking of water level in fire water reservoir and topping up.
Regular Maintenance of Fire Water Pumps and Valves : Walk around visual inspection for any abnormality and external cleaning of the fire water pumps, cleaning of Suction Strainers, attending any gland leaks in the pumps & valves, greasing the pump bearing etc., and any other unforeseen work as directed by the Engineer in-charge.
Regular Maintenance of Diesel Engines of Fire water pumps and DG set : Walk around visual inspection for any abnormality and external cleaning of diesel engines, checking the coolant and engine oil levels and topping up, cleaning of suction strainers and checking the engine cooling system etc., and any other unforeseen works as directed by the Engineer in-charge
Regular Maintenance of Fire Hydrant System and Firewater spray system : Walk around visual inspection for any abnormality and visual inspection of the system for any leak, loose hardware, leak gaskets, valve gland packing leaks, checking the tightness of the bolts and nuts, greasing of the valve stem & Hydrant valves, washing of the Fire hoses in clear water and drying by natural ventilation, general check-up, general check-up of deluge valve, cleaning of suction strainers of spray system, checking of discharge nozzles, up keeping of the system by through external cleaning and corrective action as required as per the direction of the Engineer in-charge.
Preventive maintenance of Portable Fire Extinguisher and Trolley Mounted Fire Extinguishers: Walk around the Fire Extinguishers for any abnormality and visual inspection of the extinguishers for any leak, loose hardware, leaky gaskets, Checking the tightness of the bolts, nuts & hoses, checking the nozzle for any obstruction, greasing of cap threads, general check- up , up keeping of the extinguishers by thorough external cleaning, and attending the corrective action as required as per the direction of the Engineer in-charge.
Preventive Maintenance of automatic CO2 Flooding System: Walk around the CO2 Flooding System (CO2 banks) for any abnormality and visual inspection of the system for any leak, loose hardware, leaky gaskets, valve leaks, checking the tightness of the bolts & nuts, visual checking of the gas transfer hoses , general checkup , up keeping of the system by thorough external cleaning, and attending the corrective action as required as per the direction of the Engineer in-charge.
Operation and Periodical Maintenance of EOT Crane capacity of 35/5 Ton and 10 T Electrical Hoist: Walk around visualinspection for any abnormality, Regular Operation check-up (LT, CT, AH, MH). Checking of oil level in the LT, CT, AH,MH gearboxes, thruster brakes and topping up. Minor adjustments of brake shoes in thrusters, greasing and external cleaning of 35/5 TON EOT crane and 10TON Electrical hoist as directed by the Engineer-in-charge
Operation and Periodical Maintenance of EOT Crane capacity of 15 Ton and 10 TON Electrical Hoist: Walk around visual Inspection for any abnormality, Regular Operation check-up (LT, CT, AH, MH). Checking of oil level in the LT, CT, AH,MH gearboxes, thruster brakes and topping up. Minor adjustments of brake shoes in thrusters, greasing and external cleaning of 15 TON EOT crane and 10 TON Electrical hoist as directed by the Engineerin-charge.
Operation and Periodical Maintenance of EOT Crane capacity of 5Ton and 5TON Electrical Hoist: Walk around visualinspection for any abnormality, Regular Operation check-up (LT, CT, AH, MH). Checking of oil level in the LT, CT, AH,MH gearboxes, thruster brakes and topping up. Minor adjustments of brake shoes in thrusters, greasing and external cleaning of 5 TON EOT crane and 10 TON Electrical hoist as directed by the Engineerin-charge
Charges for assistance tothe medical officer during working hours and Upkeeping of OHC: Maintainingthe Patient waiting room, Assisting the Medical Officer during consultation and diagnosis of patients, assisting in the medical treatment room, updating of health records.
Breakdown maintenance of Hydrant and Spray lines: Trace out the actual puncture location in the hydrant and spray lines, isolating the valves for water leak arresting , fabrication and pipeline welding work in Hydrant and spray lines after attending the leak, charging the line for leak testing work etc., and any other unforeseen works as directed by the engineer – in – charge.
Fire water pump (125 KW) AC and diesel engine driven pump Break down maintenance and overhauling work: This work comprise of dismantling of the pump after decoupling with motor in to its component such as bearing s glands, shaft sleeve, impeller and shaft, logging rings, through cleaning of the parts, replace the worn out parts by new one which was supplied by the board and reassembly the pump, alignment checking and coupling with the motor all complete
Fire water pump (Jockey pump15 KW) Break down maintenance and overhauling Work: This work comprise of dismantling of the pump after decoupling with motor in to its component such as bearing s glands, shaft sleeve, impeller and shaft, logging rings, through cleaning of the parts, replace the worn out parts by new one which was supplied by the board and reassembly the pump, alignment checking and coupling with the motor all complete as per the direction of Engineer in-charge
Dismantling the Hydrant line valves/Spray line valves/Sprinkler System valves in Firefighting system for inspection, greasing/replace the defective valve by new one which will be supplied by TANGEDCO, reassembling the valves and lines, normalize the system etc., as per the direction of Engineer in-charge.
Labour charges for replacement of defective Co2 Cylinders, connecting Hoses in the Co2 flooding system, re-fix with new cylinder and hose, leak testing and normalizing the system as per the direction of Engineer in-charge. The required cylinder and hoses will be supplied by TANGEDCO
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .