| 1 | L1₹43.5 LAccepted-AOC | ₹43.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹43.5 L+₹4,052 (0.09%)Rejected-Finance 1 9 KANGEYAMAPALAYAM P SULUR COIMBATORE DIST | COIMBATORE | TAMIL NADU | 638459 | ₹43.5 L+₹4,052 (0.09%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | A VENKATACHALAM L2 | KADAIESWARI AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 1,134 | M2 | 21.5 ₹24,381 | 21 ₹23,814 Lowest |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Clause 406. | 510 | M3 | 2,021 ₹10,30,710 Lowest | 2,021 ₹10,30,710 Lowest |
| 3.00 | Providing and laying Priming coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 502 of MORTH Rev-5. | 3,400 | M2 | 80.5 ₹2,73,700 | 80 ₹2,72,000 Lowest |
| 4.00 | Providing and laying Tack coat over WBM/WMM surface (Preaped with primer) using 2.50Kg of Bitu Emulsion (RS1)for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 503 of MORTH Rev-5. | 3,400 | M2 | 18.5 ₹62,900 | 18 ₹61,200 Lowest |
| 5.00 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of vt 30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5. | 170 | M3 | 10,300.5 ₹17,51,085 | 10,300 ₹17,51,000 Lowest |
| 6.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30 kgs of VG 30 /VG 40 bitumen for premixing for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5. | 102 | M3 | 10,924 ₹11,14,248 Lowest | 10,924 ₹11,14,248 Lowest |
| 7.00 | Road Marking with Hot Applied ThermoPlastic Compound With Reflectorsing Glass Beads on Bituminious Surface Providing and Laying of Hot Applied Thermoplastic Compound 2.5mm thick inculding reflectorsing glassbeads @ 250gms Per Sqm area thickness of 2.5mm exclusive of Surface applied glass beads As per IRC:35 The finished Surface to be level uniform and free from streaks and holes inculding all charges | 107 | M3 | 890 ₹95,230 Lowest | 890 ₹95,230 Lowest |
Tender Value
₹52.9 L
EMD Value
₹52,900
Closing Date
20 May 2025, 3:00 pmClosed
Executive Officer
Vellalore Town Panchayat, Coimbatore
Providing BT Road at ward No.2, Om Sakthi nagar in Vellalore Town Panchayat.
2025_DTP_557456_1
TURIP 25-26 Providing BT Road at ward No.2, Om Sakthi nagar in Vellalore Town Panchayat.
Open Tender
Civil Works
Works
Vellalore Town Panchayat
As pernorm
3 documents required · 3 mandatory
₹0
₹52,900
Yes
Vellalore Town Panchayat Office
10 Nov 2025
13 May 2025
20 May 2025
13 May 2025
20 May 2025
13 May 2025
13 May 2025 - 20 May 2025
14 May 2025
Amount
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Clause 406.
Providing and laying Priming coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 502 of MORTH Rev-5.
Providing and laying Tack coat over WBM/WMM surface (Preaped with primer) using 2.50Kg of Bitu Emulsion (RS1)for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 503 of MORTH Rev-5.
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of vt 30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30 kgs of VG 30 /VG 40 bitumen for premixing for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5.
Road Marking with Hot Applied ThermoPlastic Compound With Reflectorsing Glass Beads on Bituminious Surface Providing and Laying of Hot Applied Thermoplastic Compound 2.5mm thick inculding reflectorsing glassbeads @ 250gms Per Sqm area thickness of 2.5mm exclusive of Surface applied glass beads As per IRC:35 The finished Surface to be level uniform and free from streaks and holes inculding all charges
A VENKATACHALAM (BID ID -1345219)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .