Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 CrAdmitted-Finance | ₹8.2 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Pepperl & Fuchs Process Automation Pvt Ltd L1 |
|---|---|---|---|---|
| 1.00 | FOUNDATION FIELD BUS SYSTEM UNIT-1 (2754 Nos-Boiler SH,RH Metal Temperatures, 120 Nos-Generator Core/Slot temperature measurements, along with spare) | 1 | Set | 4,23,56,393 ₹4,99,80,543.74 Lowest |
| 2.00 | FFB-TESTING AND TRAINING PANEL UNIT-1 | 1 | Set | 16,05,530 ₹18,94,525.4 Lowest |
| 3.00 | ERECTION SUPERVISION AND COMMISSIONING FOR UNIT-1 | 1 | Set | 2,00,000 ₹2,36,000 Lowest |
| 4.00 | FOUNDATION FIELD BUS SYSTEM UNIT-2 (962 Nos- Boiler SH,RH Metal Temperatures, 120 Nos-Generator Core/Slot temperature measurements, along with spare) | 1 | Set | 1,57,23,045 ₹1,85,53,193.1 Lowest |
| 5.00 | FFB-TESTING AND TRAINING PANEL UNIT-2 | 1 | Set | 16,05,530 ₹18,94,525.4 Lowest |
| 6.00 | ERECTION SUPERVISION AND COMMISSIONING FOR UNIT-2 | 1 | Set | 2,00,000 ₹2,36,000 Lowest |
| 7.00 | MANDATORY SPARE FOR FOUNDATION FIELD BUS SYSTEM FOR UNIT-1&2 | 1 | Set | 74,00,000 ₹87,32,000 Lowest |
| 8.00 | Freight | 1 | AU | 2,00,000 ₹2,36,000 Lowest |
Tender Value
Refer Docs
Closing Date
19 May 2026, 1:00 pmClosed
Kumar Yashu
BHELEDN
KRYNIC0106 Supply of Foundation Field Bud for NTPC Talcher
2026_BHEL_60507_2
KRYNIC0106
Open Tender
Electronic Components And Devices
Supply
180 days
Online
KRYNIC0106 Supply of Foundation Field Bud for NTPC Talcher
2 documents required · 2 mandatory
₹0
Exempted
27 Jul 2026
5 May 2026
19 May 2026
5 May 2026
19 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | FOUNDATION FIELD BUS SYSTEM UNIT-1 (2754 Nos-Boiler SH,RH Metal Temperatures, 120 Nos-Generator Core/Slot temperature measurements, along with spare) | 1 | Set | - | - | 0.18% |
| 2 | FFB-TESTING AND TRAINING PANEL UNIT-1 | 1 | Set | - | - | 0.18% |
| 3 | ERECTION SUPERVISION AND COMMISSIONING FOR UNIT-1 | 1 | Set | - | - | 0.18% |
| 4 | FOUNDATION FIELD BUS SYSTEM UNIT-2 (962 Nos- Boiler SH,RH Metal Temperatures, 120 Nos-Generator Core/Slot temperature measurements, along with spare) | 1 | Set | - | - | 0.18% |
| 5 | FFB-TESTING AND TRAINING PANEL UNIT-2 | 1 | Set | - | - | 0.18% |
| 6 | ERECTION SUPERVISION AND COMMISSIONING FOR UNIT-2 | 1 | Set | - | - | 0.18% |
| 7 | MANDATORY SPARE FOR FOUNDATION FIELD BUS SYSTEM FOR UNIT-1&2 | 1 | Set | - | - | 0.18% |
| 8 | Freight | 1 | AU | - | - | 0.18% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Tender0106.pdf
Tender Documents • 10.00 MB
BOQ_65911.xls
BOQ • 0.28 MB
ApprovalBDD.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .