Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.7 LAccepted-AOC AT BHOKANJI PO BADAMUNDILO PS DIST JAGATSINGHPUR | ₹33.7 L | 1 | Accepted-AOC QUALIFIED AFTER DRAWL OF LOTTARY. |
| 2 | 1₹33.7 LRejected-AOC | ₹33.7 L | 1 | Rejected-AOC DIS-QUALIFIED AFTER DRAWL OF LOTTARY. |
| 3 | 1₹33.7 LRejected-AOC | ₹33.7 L | 1 | Rejected-AOC DIS-QUALIFIED AFTER DRAWL OF LOTTARY. |
| 4 | 1₹33.7 LRejected-AOC | ₹33.7 L | 1 | Rejected-AOC DIS-QUALIFIED AFTER DRAWL OF LOTTARY. |
| 5 | 1₹33.7 LRejected-AOC AT DANDUGUDA PO PS KHATIGUDA DIST NAWARANGPUR 764070 | NABARANGPUR | ODISHA | 764070 | ₹33.7 L | 1 | Rejected-AOC DIS-QUALIFIED AFTER DRAWL OF LOTTARY. |
Updated dates
Tender Value
₹33.7 L
EMD Value
₹33,770
Closing Date
11 May 2026, 5:30 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, CUTTACK
Construction of 1 No. D type quarter Building at Bramhapura PHC under Banki block of Cuttack District for the year 2025-26.
2026_CERWI_128545_1
33 of 2025-26
Open Tender
Miscellaneous Works
180 days
Cuttack
2 documents required · 2 mandatory
₹6,000
₹33,770
Yes
8 Jun 2026
28 Apr 2026
12 May 2026
28 Apr 2026
11 May 2026
28 Apr 2026
28 Apr 2026 - 11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in hard soil including hard moorum, stony earth mixed with boulders (except sheet rock & boulders requiring blasting) with all leads & lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads & lifts including cost of all labour, cess & T&P and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge.
Ground Floor | 119.78 | cum | 276.89 | ₹33,165.88 | NI-32-6071-1 |
| 2 | Providing & filling manualy with aproved quality of sand in layers not exceeding 150mm thick including watering ramming to proper density with cost,conveyance, royality, taxes of all materials and cost of all labour & T & P as required for the item of work including cess etc complete as per specification & direction of Engineer-in-charge.
Ground Floor | 110.76 | cum | 716.96 | ₹79,410.49 | NI-32-6071-2 |
| 3 | Providing Cement Concrete (1:3:6) with 40mm size clean hand broken granite metal of approved quality from approved quarry including hoisting lowering & levelling in position to required level in each layer not exceeding 15cm thick in foundation including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering with cost conveyance taxes royality, labour of all materials and including hire & running charges of machineries T&P required for the work including supplying & working of pumps and cess as per the specifiction and direction of Engineer-in- charge
Ground Floor | 31.86 | cum | 5,925.36 | ₹1,88,781.97 | NI-32-6071-3 |
| 4 | Cement Concrete (1:2:4) with 12mm size hard granite chips includimg hoisting and laying etc complete as per direction of the engineer-in -charge.
Ground Floor | 7.19 | cum | 7,573.83 | ₹54,455.84 | NI-32-6071-4 |
| 5 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying and compacting concrete by using vibrator with watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessay including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as as per the specification and direction of the Engineer-in-charge. Column Base & Foundation
Ground Floor | 21.26 | cum | 7,314.3 | ₹1,55,502.02 | NI-32-6071-5 |
| 6 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying and compacting concrete by using vibrator with watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessay including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as as per the specification and direction of the Engineer-in-charge. Ground Floor (Plinth Bend) | 7.36 | cum | 7,314.3 | ₹53,833.25 | NI-32-6071-6 |
| 7 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying and compacting concrete by using vibrator with watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessay including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as as per the specification and direction of the Engineer-in-charge. (Coloumn) Ground Floor | 8.09 | cum | 18,279.19 | ₹1,47,878.65 | NI-32-6071-7 |
| 8 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying and compacting concrete by using vibrator with watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessay including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as as per the specification and direction of the Engineer-in-charge. (Wall Beam) Ground Floor | 6.73 | cum | 18,279.19 | ₹1,23,018.95 | NI-32-6071-8 |
| 9 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying and compacting concrete by using vibrator with watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessay including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as as per the specification and direction of the Engineer-in-charge. (Roof Slab) Ground Floor | 15.31 | cum | 13,887.69 | ₹2,12,620.53 | NI-32-6071-9 |
| 10 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and laying and compacting concrete by using vibrator with watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessay including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as as per the specification and direction of the Engineer-in-charge. (Lintel (10") wall) Ground Floor | 3.68 | cum | 14,297.4 | ₹52,614.43 | NI-32-6071-10 |
stage.html
html • 0.18 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589004.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.21 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_589004.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid