Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹25.5 L (6.25%)Admitted-Finance | ₹4.3 Cr+₹25.5 L (6.25%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Tara Chand Jain L1 | hitech construction L2 |
|---|---|---|---|---|---|
| 1.00 | Removal of unserviceable soil including excavation,loading and disposal up to 1000m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil which shall be paid separtly as per clause 305 | 6,010 | Cum | 269 ₹16,16,690 Lowest | 273 ₹16,40,730 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 2,296 | Cum | 362 ₹8,31,152 Lowest | 368 ₹8,44,928 |
| 3.00 | Construction of subgrade & earthen shoulders with approved materials obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (including land compensation of earth) (a), (Inclcost of testing of materials at site and laboratory as directed by the Deptt.).
(a) From Private Land | 2,296 | Cum | 430 ₹9,87,280 Lowest | 436 ₹10,01,056 |
| 4.00 | Construction of Granular Sub Base (GSB) by providing coarse graded materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per cl.401 (with an initial lead of 5 Km.)
(ii) for Grading-I Material | 688.8 | Cum | 3,615 ₹24,90,012 Lowest | 3,671 ₹25,28,584.8 |
| 5.00 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening Type-B/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. )
B) Grading-II material | 344.4 | Cum | 5,150 ₹17,73,660 Lowest | 5,230 ₹18,01,212 |
| 6.00 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening Type-B/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. )
B) Grading-III material | 344.4 | Cum | 5,320 ₹18,32,208 Lowest | 5,400 ₹18,59,760 |
| 7.00 | Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(i) With bitumen emulsion-CSS-1h | 4,592 | sqm | 64 ₹2,93,888 Lowest | 65 ₹2,98,480 |
| 8.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(i) With bitumen emulsion-CSS-1h, Granular surfaces treated with primer | 9,184 | sqm | 14 ₹1,28,576 Lowest | 14 ₹1,28,576 Lowest |
| 9.00 | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 344.4 | Cum | 11,731 ₹40,40,156.4 Lowest | 11,915 ₹41,03,526 |
| 10.00 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.) | 183.68 | Cum | 13,200 ₹24,24,576 Lowest | 13,405 ₹24,62,230.4 |
Tender Value
Refer Docs
EMD Value
₹8.2 L
Closing Date
10 Mar 2021, 2:00 pmClosed
Chief Engineer, PWD(Roads), Assam
O/o the Chief Engineer, PWD(Roads), Assam
Construction of Maharshi Complex connecting road (Construction of RCC foot path cum drain and double lane surface road) (Ch. 0.00 M to Ch. 574.00 M) under SOPD (G) for the year 2020-21
2021_PWD_21556_1
Maharshi Complex connecting road
Open Tender
Civil Works – Roads
Item Rate
365 days
Guwahati
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Yes
Empowered Officer, ASRB
₹8.2 L
Yes
10 May 2021
2 Mar 2021
10 Mar 2021
2 Mar 2021
10 Mar 2021
2 Mar 2021
2 Mar 2021 - 10 Mar 2021
Amount
Removal of unserviceable soil including excavation,loading and disposal up to 1000m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil which shall be paid separtly as per clause 305
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Construction of subgrade & earthen shoulders with approved materials obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (including land compensation of earth) (a), (Inclcost of testing of materials at site and laboratory as directed by the Deptt.). (a) From Private Land
Construction of Granular Sub Base (GSB) by providing coarse graded materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per cl.401 (with an initial lead of 5 Km.) (ii) for Grading-I Material
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening Type-B/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) B) Grading-II material
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening Type-B/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) B) Grading-III material
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(i) With bitumen emulsion-CSS-1h
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(i) With bitumen emulsion-CSS-1h, Granular surfaces treated with primer
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, includingsetting out, construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and Bottom ,backfilling the excavated earth to the extent required andutilising the remaining earth locally for road work.) (v) Marshy Soil (Depth up to 3m) With dewatering
Dry rubble Flooring, Construcytion of dry rubbl flooring at cross drainage works for relatively less important works.
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced Cement Concrete in sub structure complete as per Drawing and Technical Specification and steel suttering frame work. RCC Grade M-20, Height upto 5 m , Using Concrete Mixture
Supplying,fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specification (b) IS:1786 (Fe-500 D) Secondary Producer (ISI approved)
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification
Sand Filling in foundation trenches as per Drawing & Technical Specification
hitech construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .